Installation Guide

6 31-11007-2
Installation Instructions
PREPARE THE WALL
Hood Body
1. Putaprotectivecoveringoverthesurfacebelow
thelocationofthehoodtoprotectfromdirtand/or
damage.
2. Determineandmarkthecenterlineonthewall(draw
lineuptotheceiling)wheretherangehoodwillbe
installed.Basedontheceilingheight,determinethe
distance24”requiredmin,36”recommendedmax
(X)neededbetweenthecookingsurface(B)andthe
bottomofthehood.Tothisdistance,add12-5/8”and
drawahorizontalline(A)about24”longcenteredon
theverticalcenterline(C).
3. Alignthetopedgeofthemountingbracketwiththe
horizontalline(A).Alignthecenternotchesofthe
bracketwiththecenterline(C)andmarkthecenter
ofthebracketholes.Removethebrackettodrill
the2canopymountinganchorsintothewallatthe
markings.Placethemountingbracketbackonthe
wallandinstallthe2mountingscrewswith2washers
intotheanchors.Tightenscrews.
4. Drawasecondhorizontalline(D)thatis1”added
fromthe(X)distance.Drillaholeintothewallwitha
9/32”drillbitattheintersectionofthehorizontalline
(D)andverticalcenterline(C).Insertaductcover
anchor.
Duct Covers and Power Supply
1. Placeoneoftheductcoverbracketsagainstthe
wallsothatitstopedgeis1/16”fromtheceilingand
level.Alignthecenternotchesofthebracketandthe
centerline(C)andmarkthecentersofthebracket
holes.Removethebrackettodrillthe2holesfor
installationwitha9/32”drillbit,andinserttheduct
coveranchors.Placethebracketbackonthewall
andinstallthe2mountingscrewsintotheanchors.
Tightenscrews.
2. Placetheotherductcoverbracketonthewallso
thatitstopedgeis15-1/2”fromtheceilingandlevel.
Alignthecenternotchesofthebracketandthe
centerline(C)andmarkthecentersofthebracket
holes.Removethebrackettodrillthe2holesfor
installationwitha9/32”drillbit,andinserttheduct
coveranchors.Placethebracketbackonthewall
andinstallthe2mountingscrewsintotheanchors.
Tightenscrews.
3. Determineandmarkwheretheholewillbedrilledfor
thepowersupplycabletoberunthroughthewall.
Thecenteroftheholecanbelocated4”totheleftor
rightofthecenterline(C)whileremainingbetween4”
and13”downfromtheceiling.Oncethecenterofthe
holeismarked,drilla1¼”diameterhole.
A
C
B
12-5/8"
1"
X
24to36"
D
C
A
HoodMounting
Bracket
MountingScrews&Washers
DrillHere
1/16"
C
4” 4”
4to13”
from
Ceiling
Ceiling
151/2”