Use and Care Manual
Operation
Important Owner’s Considerations
Engine Oil
This engine is shipped from the factory pre-run and filled
with non-synthetic oil (API SL 10W-30W). This allows
for system operation in a wide range of temperature and
climate conditions. Before starting the engine, check oil
level and ensure that engine is serviced as described in the
Maintenance section.
Coolant System
This engine is shipped from the factory filled with a
50-50 mix of automotive (ethylene glycol) anti-freeze and
water. This will provide optimum year round protection
against freezing, boiling and corrosion.
Battery
The installer must supply a valve-regulated, rechargeable
12 volt DC starting battery. See Battery in Final Installation
Considerations in the installation manual.
15 Amp Fuse
The generator’s 15 Amp fuse is critical to correct system
operation. The 15 Amp fuse was removed at the factory to
prevent the unit from starting during shipping. Your installer
will ensure the fuse is properly installed upon completion of
the installation.
NOTICE Any attempt to crank or start the engine before it
has been properly serviced with the recommended coolant
or oil will result in equipment failure.
• Refer to the Maintenance section for coolant and oil fill
information.
• Damage to equipment resulting from failure to follow this
instruction will void engine and generator warranty.
WARNING Battery posts, terminals and related
accessories contain lead and lead compounds - chemicals
known to the State of California to cause cancer and
reproductive harm. Wash hands after handling.
Automatic Operation
To select automatic operation, do the following:
1. Confirm 15 Amp fuse is installed in control panel.
2. Set the main distribution panel circuit breaker that
sends utility voltage to the transfer switch to ON.
3. Set the generator’s circuit breaker to its ON position.
4. Set the control panel system switch to AUTO.
Checking Automatic Operation
To check the system for proper automatic operation, proceed
as follows:
1. Turn OFF the service disconnect or main distribution
panel circuit breaker sending power to the automatic
transfer switch.
When utility voltage is lost and the sensor has timed
out, the engine will crank and start. Let the system go
through its entire automatic operation sequence.
2. With the generator output supplying its loads, turn ON
the service disconnect or main distribution panel circuit
breaker that supplies utility power to the automatic
transfer switch.
3. The automatic transfer switch will transfer loads back
to utility power after a 5 minute minimum run time and
utility power is available.
4. The generator will run for an additional one minute for
engine cool down, then shut down.
If utility power is restored and generator does not shut down
after 10 minutes, set system switch to OFF and contact your
installer or local service center.
This completes the test procedures for automatic operation.
The generator will now start automatically and will supply
power to the transfer switch when utility power islost.
CAUTION Installing the 15A fuse could cause the
engine to start at any time without warning
resulting in minor or moderate injury.
• Observe that the 15 Amp fuse has been removed from the
control panel for shipping.
• DO NOT install this fuse until all plumbing and wiring has
been completed and inspected.
NOT
for
REPRODUCTION