User manual
– 29 –
Control Panel
1. Remove the grille (see previous procedure).
2. Remove 1 screw from the top center of the
control panel.
3. Open the oven door.
4. Slide the panel up to release the upper locking
tabs and tilt the top of the panel out.
GEA00989
Wiring Harness
Connectors
Wiring Harness
Connectors
Locking TabsLocking Tabs
5. Pull the bottom of the panel out and slide the
panel down to release the lower locking tab.
6. Disconnect wiring harness connectors and
remove the control panel.
Door Interlock Switches
1. Remove the control panel (see procedure).
GEA00994
Screws
Screws
Screws
2. Remove 2 screws and pull the interlock latch
board out to access the wire leads.
GEA01022
Primary
Primary
Interlock
Primary
Interlock
Wire
Wire
Leads
Wire
Leads
Interlock
Monitor
Monitor
Interlock
Monitor
Door Sensing
(Secondary Interlock)
Door Sensing
(Secondary Interlock)
3. Remove the wire leads from the switches and
remove the interlock latch board.
Main PCB
Note: Voltage compensation test must be
performed when main PCB is replaced (refer to
test on page 50).
1. Remove the control panel (see procedure)
and place face down on a protected surface.
The main PCB is attached to the back of the
control panel.
GEA00990
ConnectorsConnectors
ScrewsScrews
Main
PCB
Main
PCB
Locking
Tabs
Locking
Tabs
CatchCatch