Installation Guide

For Help, Go To: cbyge.com/switch-support or call 1-844-30C-BYGE For Help, Go To: cbyge.com/switch-support or call 1-844-30C-BYGE 98
And we’re here to help.
For in-depth instructional videos and a
guided tour through the installation, go to
cbyge.com/switch-support.
You Got This!
BEFORE YOU DO ANYTHING: Step 1
Turn Off The Power!
Turn off the power for the
switch location at the circuit
breaker box.
Test existing switch by toggling
switch on/off, ensuring lights do
not turn on.
Now, follow these setup steps
for a single gang switch.
ON OFF
digital review only
PC93120076 INS
3.25"
4.25"
This art is supplied at 100% size.
Do not resize, reshape or alter in any way.
93120076 NPI C by GE 5857619 Q3
6 (01-17-20) CN
N/A
NONE
N/A
NOT CONTROLLED
PMS
COOL
GRAY 11
Approvals designate all items on checklist have
been reviewed & are correct in addition to other
organizational responsibilities.
Proof Reading – Spelling
Proof against TDS request
Website
Graphics Printability
REVIEWED
DATE
PACKAGING GRAPHICS
SIGNATURE
Job#/Project Name:
Bar Code:
Insert:
Supplier Project#:
GE DIE#:
Offset/Litho
Version# (date):
Process
CYAN
Process
MAGENTA
Process
YELLOW
Process
BLACK
Lighting Graphics App roval
Print Method: Flexo (direct)
PK-00102820-1PK#:
This art is supplied at 100% size.
Do not resize, reshape or alter in any way.
3.25"
4.25"
PC93120076 INS
93120076 NPI C by GE 5857619 Q3
6 (01-17-20) CN
N/A
NONE
N/A
NOT CONTROLLED
PMS
COOL
GRAY 11
Approvals designate all items on checklist have
been reviewed & are correct in addition to other
organizational responsibilities.
Proof Reading – Spelling
Proof against TDS request
Website
Graphics Printability
REVIEWED
DATE
PACKAGING GRAPHICS
SIGNATURE
Job#/Project Name:
Bar Code:
Insert:
Supplier Project#:
GE DIE#:
Offset/Litho
Version# (date):
Process
CYAN
Process
MAGENTA
Process
YELLOW
Process
BLACK
Lighting Graphics App roval
Print Method: Flexo (direct)
PK-00102820-1PK#:
digital review only