Installation Guide

FIGURE 4
FIGURE 5
MOUNTING
3
WARNING
Risk of injury or damage. Unit will fall if not installed
properly. Follow installation instructions.
HANDLING
2
This luminaire has been properly packed so that no
parts should have been damaged during transit.
Inspect to conrm.
The mounting bracket is shipped in a separate box.
Damage may occur if luminaire is improperly handled
outside of pack.
Do not impact or stack luminaire after removal from
packaging.
UNPACKING
1
1. Drill 4 3/8” mount holes for dimensions in ceiling to
mount xture. If the size of open hole of ceiling is less
than
1”, then enlarge the open hole to 1”. Please refer
to the
mounting template. (See Fig.3)
2. Clean all areas that will be sealed.
B. Liberally apply RTV sealant where the holes were
drilled and around the large center hole on both sides
of the gasket. Place the big gasket on the top of the
holes. (See Fig.4))
C. Place pre-installed plate bracket on the gasket.
(See Fig.5)
FIGURE 3
D. RTV caulk around the plate bracket and all fasteners
to ensure waterproong of luminaire. (See Fig.6)
FIGURE 6
DRILL 3/8”
A. Pre-installation
Surface Mount
E. Let one side of SJOW cable wire pass through hole
using a waterproof sleeve to connect to existing power
line in existing terminal box. Tighten the nut of
waterproof sleeve. (See Fig. 7)
FIGURE 7