Product Manual
Table Of Contents
- Vivid™ E80 / Vivid™ E90 / Vivid™ E95
- Table of Contents
- Chapter 1
- Introduction
- Chapter 2
- Site Preparations
- General Ultrasound system requirements
- Facility needs
- Environmental Dangers
- Chapter 3
- System Setup
- Setup reminders
- Receiving and unpacking the equipment
- Packing materials - recycling information
- Preparing for setup
- Completing the setup
- Configuration
- Connectivity overview
- Connectivity setup
- Product Locator Installation Card
- Chapter 4
- General Procedures and Functional Checks
- Chapter 5
- Components and Functions (Theory)
- Software overview
- InSite ExC
- Vivid E80/E90/E95 overview
- Top Console with LCD monitor and Operating Panel
- Main Console
- Air Flow control
- Casters and brakes
- Front End Processor (FEP)
- Back End Processor (BEP)
- Power distribution
- Input and Output (I/O) modules
- Restart Vivid E80/E90/E95 after diagnostics
- Chapter 6
- Service Adjustments
- Chapter 7
- Diagnostics/Troubleshooting
- Chapter 8
- Replacement Procedures
- Warnings and important information
- Loading the software
- Replacing covers and bumpers
- LCD Monitor and LCD Arm parts replacement
- Upper OP Panel/Touch Panel Assembly replacement
- Lower Operating Panel Parts replacement
- A/N Keyboard parts replacement
- Other Top Console Parts replacement
- Replacing XYZ Parts
- Main Console parts replacement
- Casters and Brakes replacement
- Front End Processor (FEP) / Card Cage parts replacement
- Back End Processor (BEP) parts replacement
- Main Power Supply replacement
- Patient I/O assembly replacement
- Peripherals replacement
- Cables replacement
- Chapter 9
- Renewal Parts
- List of Abbreviations
- Software for Vivid E80/E90/E95
- Covers and Bumpers
- Top Console parts
- XYZ parts
- Main Console parts
- Casters (wheels) parts
- Front End Processor (FEP) Card Rack parts
- Back End Processor (BEP) parts
- Main Power Supply
- I/O modules parts
- Peripherals for use with Vivid E80/ E90/E95
- Mains power cables - Vivid E80/E90/ E95
- Internal Cables - Vivid E80/E90/E95
- ECG cables - Vivid E80/E90/E95
- Physio TX parts
- Probes for Vivid E80/E90/E95
- Options - Vivid E80/E90/E95
- Chapter 10
- Care and Maintenance
- Index
General Procedures and Functional Checks
4-4 Vivid E80/E90/E95 – Service Manual
GC091052
Rev. 3
Switch ON the AC Power to Vivid E80/E90/E95
1. Switch ON the Mains Power Circuit Breaker at the rear of
the unit.
You should hear a “click” from the relays in the AC Power
and the unit is ready to boot.
2. Press once on the On/Off key on the Operating Panel to
boot the Ultrasound system.
During a normal boot, you may observe that:
a. The Ultrasound system’s ventilation fan starts on full
speed, but slows down after a few seconds (listen to the
fan sound).
b. Power is distributed to the peripherals, Operating Panel
(Console), Monitor, Front End Processor, and Back End
Processor.
c. Back End Processor and rest of Ultrasound system
starts with the sequence listed in the next steps:
d. Back End Processor is turned ON and starts to load the
software.
e. The Start Screen is displayed on the monitor.
f. A start-up bar indicating the time used for software
loading is displayed on the monitor.
g. The software initiates and sets up the Front End
electronics and the rest of the instrument.
h. The backlight in the keyboard is lit.
i. As soon as the software has been loaded, either a 2D
screen is displayed on the screen, indicating that a
probe has been connected, or a No Mode screen is
displayed, indicating that no probe has been connected.
NOTE: Total time used for start-up is typically 90 seconds or
less. If starting after a power loss or a lock-up, the
start-up time may be up to four minutes.