Product Manual
Table Of Contents
- Vivid™ E80 / Vivid™ E90 / Vivid™ E95
- Table of Contents
- Chapter 1
- Introduction
- Chapter 2
- Site Preparations
- General Ultrasound system requirements
- Facility needs
- Environmental Dangers
- Chapter 3
- System Setup
- Setup reminders
- Receiving and unpacking the equipment
- Packing materials - recycling information
- Preparing for setup
- Completing the setup
- Configuration
- Connectivity overview
- Connectivity setup
- Product Locator Installation Card
- Chapter 4
- General Procedures and Functional Checks
- Chapter 5
- Components and Functions (Theory)
- Software overview
- InSite ExC
- Vivid E80/E90/E95 overview
- Top Console with LCD monitor and Operating Panel
- Main Console
- Air Flow control
- Casters and brakes
- Front End Processor (FEP)
- Back End Processor (BEP)
- Power distribution
- Input and Output (I/O) modules
- Restart Vivid E80/E90/E95 after diagnostics
- Chapter 6
- Service Adjustments
- Chapter 7
- Diagnostics/Troubleshooting
- Chapter 8
- Replacement Procedures
- Warnings and important information
- Loading the software
- Replacing covers and bumpers
- LCD Monitor and LCD Arm parts replacement
- Upper OP Panel/Touch Panel Assembly replacement
- Lower Operating Panel Parts replacement
- A/N Keyboard parts replacement
- Other Top Console Parts replacement
- Replacing XYZ Parts
- Main Console parts replacement
- Casters and Brakes replacement
- Front End Processor (FEP) / Card Cage parts replacement
- Back End Processor (BEP) parts replacement
- Main Power Supply replacement
- Patient I/O assembly replacement
- Peripherals replacement
- Cables replacement
- Chapter 9
- Renewal Parts
- List of Abbreviations
- Software for Vivid E80/E90/E95
- Covers and Bumpers
- Top Console parts
- XYZ parts
- Main Console parts
- Casters (wheels) parts
- Front End Processor (FEP) Card Rack parts
- Back End Processor (BEP) parts
- Main Power Supply
- I/O modules parts
- Peripherals for use with Vivid E80/ E90/E95
- Mains power cables - Vivid E80/E90/ E95
- Internal Cables - Vivid E80/E90/E95
- ECG cables - Vivid E80/E90/E95
- Physio TX parts
- Probes for Vivid E80/E90/E95
- Options - Vivid E80/E90/E95
- Chapter 10
- Care and Maintenance
- Index
Power distribution
Vivid E80/E90/E95 – Service Manual 5-41
GC091052 Rev. 3
General description (continued)
The Main Power Supply delivers the needed voltages to the rest
of the Ultrasound system:
• Internal peripherals (115 V
AC
)
• Front End Rack (DC power with several voltages)
• +24 V
DC
• +/- 15 V
DC
• +/- 6V
DC
• Front End Rack (TSV1 and TSV2 for the transmitters)
• TSV1: +/-2.5 V
DC
to +/-95V
DC
• TSV2: +/-2.5 V
DC
to +/-95V
DC
• Front End Rack (PMX for the probe channel multiplexers
inside some probes) +/-100V
DC
• Back End Processor (48 V
DC
)
• Operating Panel, LCD, XYZ motors (48 V
DC
)
The mains cord has plugs in both ends. A female plug connects
to the Ultrasound system and a male plug to the wall outlet.
Temperature Control
The Main Power Supply is equipped with internal fans with
variable speed for temperature control.
Both the temperature of the air entering the power supply and
leaving the power supply are measured.
The fans are controlled by software.
LEDs
There are no LEDs on the Main Power Supply.