Product Manual
Table Of Contents
- Vivid™ E80 / Vivid™ E90 / Vivid™ E95
- Table of Contents
- Chapter 1
- Introduction
- Chapter 2
- Site Preparations
- General Ultrasound system requirements
- Facility needs
- Environmental Dangers
- Chapter 3
- System Setup
- Setup reminders
- Receiving and unpacking the equipment
- Packing materials - recycling information
- Preparing for setup
- Completing the setup
- Configuration
- Connectivity overview
- Connectivity setup
- Product Locator Installation Card
- Chapter 4
- General Procedures and Functional Checks
- Chapter 5
- Components and Functions (Theory)
- Software overview
- InSite ExC
- Vivid E80/E90/E95 overview
- Top Console with LCD monitor and Operating Panel
- Main Console
- Air Flow control
- Casters and brakes
- Front End Processor (FEP)
- Back End Processor (BEP)
- Power distribution
- Input and Output (I/O) modules
- Restart Vivid E80/E90/E95 after diagnostics
- Chapter 6
- Service Adjustments
- Chapter 7
- Diagnostics/Troubleshooting
- Chapter 8
- Replacement Procedures
- Warnings and important information
- Loading the software
- Replacing covers and bumpers
- LCD Monitor and LCD Arm parts replacement
- Upper OP Panel/Touch Panel Assembly replacement
- Lower Operating Panel Parts replacement
- A/N Keyboard parts replacement
- Other Top Console Parts replacement
- Replacing XYZ Parts
- Main Console parts replacement
- Casters and Brakes replacement
- Front End Processor (FEP) / Card Cage parts replacement
- Back End Processor (BEP) parts replacement
- Main Power Supply replacement
- Patient I/O assembly replacement
- Peripherals replacement
- Cables replacement
- Chapter 9
- Renewal Parts
- List of Abbreviations
- Software for Vivid E80/E90/E95
- Covers and Bumpers
- Top Console parts
- XYZ parts
- Main Console parts
- Casters (wheels) parts
- Front End Processor (FEP) Card Rack parts
- Back End Processor (BEP) parts
- Main Power Supply
- I/O modules parts
- Peripherals for use with Vivid E80/ E90/E95
- Mains power cables - Vivid E80/E90/ E95
- Internal Cables - Vivid E80/E90/E95
- ECG cables - Vivid E80/E90/E95
- Physio TX parts
- Probes for Vivid E80/E90/E95
- Options - Vivid E80/E90/E95
- Chapter 10
- Care and Maintenance
- Index
Replacement Procedures
8-36 Vivid E80/E90/E95 – Service Manual
GC091052
Rev. 3
3. Disconnect all probes and external I/O cabling.
4. Remove the OP Panel Knobs, including the Volume control
knob.
Remove the Upper OP Panel/Touch Panel Assembly
NOTE: For better access, swing the LCD Monitor to the side.
Follow these steps to remove the Upper OP Panel/Touch Panel
assembly. Ensure that the OP Panel is in its uppermost position
with the LCD out of the way:
1. At the rear of the Ultrasound system, release the
XY mechanism by inserting a screwdriver into the release
point and pressing until release.
2. Pull the Top Console out to its extended position to gain
access to the screws in the next step.
3. Remove four screws with washers from the Operating
Panel’s back cover.
4. Lift the Upper OP Panel/Touch Panel assembly slightly from
the bottom, and then tilt the top toward the front of the
Ultrasound system. There are tabs at the bottom of the
Touch Panel Assembly. Pull straight up on these tabs.
5. Disconnect the cables at the back of the Upper OP Panel/
Touch Panel Assembly.
6. Lift out the Touch Screen Assembly and place it on a clean
and ESD safe surface.
Install the Upper OP Panel/Touch Panel Assembly
Follow these steps to install the Upper OP Panel/Touch Panel
Assembly:
1. Place the Upper OP Panel/Touch Panel Assembly in the
frame.
2. Ensure that all Ground cables are connected
3. Connect the cables you disconnected earlier to the
Operating Panel, Upper.
4. Install the Upper OP Panel/Touch Panel Assembly.
5. Install the four screws to the Back Cover from behind.
CAUTION
Failure to remove the OP Panel Knobs first could cause
damage to the knob shafts.