Product Manual
Table Of Contents
- Vivid™ E80 / Vivid™ E90 / Vivid™ E95
- Table of Contents
- Chapter 1
- Introduction
- Chapter 2
- Site Preparations
- General Ultrasound system requirements
- Facility needs
- Environmental Dangers
- Chapter 3
- System Setup
- Setup reminders
- Receiving and unpacking the equipment
- Packing materials - recycling information
- Preparing for setup
- Completing the setup
- Configuration
- Connectivity overview
- Connectivity setup
- Product Locator Installation Card
- Chapter 4
- General Procedures and Functional Checks
- Chapter 5
- Components and Functions (Theory)
- Software overview
- InSite ExC
- Vivid E80/E90/E95 overview
- Top Console with LCD monitor and Operating Panel
- Main Console
- Air Flow control
- Casters and brakes
- Front End Processor (FEP)
- Back End Processor (BEP)
- Power distribution
- Input and Output (I/O) modules
- Restart Vivid E80/E90/E95 after diagnostics
- Chapter 6
- Service Adjustments
- Chapter 7
- Diagnostics/Troubleshooting
- Chapter 8
- Replacement Procedures
- Warnings and important information
- Loading the software
- Replacing covers and bumpers
- LCD Monitor and LCD Arm parts replacement
- Upper OP Panel/Touch Panel Assembly replacement
- Lower Operating Panel Parts replacement
- A/N Keyboard parts replacement
- Other Top Console Parts replacement
- Replacing XYZ Parts
- Main Console parts replacement
- Casters and Brakes replacement
- Front End Processor (FEP) / Card Cage parts replacement
- Back End Processor (BEP) parts replacement
- Main Power Supply replacement
- Patient I/O assembly replacement
- Peripherals replacement
- Cables replacement
- Chapter 9
- Renewal Parts
- List of Abbreviations
- Software for Vivid E80/E90/E95
- Covers and Bumpers
- Top Console parts
- XYZ parts
- Main Console parts
- Casters (wheels) parts
- Front End Processor (FEP) Card Rack parts
- Back End Processor (BEP) parts
- Main Power Supply
- I/O modules parts
- Peripherals for use with Vivid E80/ E90/E95
- Mains power cables - Vivid E80/E90/ E95
- Internal Cables - Vivid E80/E90/E95
- ECG cables - Vivid E80/E90/E95
- Physio TX parts
- Probes for Vivid E80/E90/E95
- Options - Vivid E80/E90/E95
- Chapter 10
- Care and Maintenance
- Index
Replacement Procedures
8-66 Vivid E80/E90/E95 – Service Manual
GC091052
Rev. 3
7. Remove the Rotary buttons below the Touch screen and the
Volume button.
8. Remove the Operating Panel, Upper.
9. Remove the Operating Panel, Lower. Place it on a clean
surface with the front down.
10. Remove the Operating Panel, Upper.
11. Remove the Operating Panel, Lower.
12. Remove the Bulkhead Board.
13. Remove the Bulkhead Plate.
14. Remove the Upper Frame Assembly.
15. Remove the Lower Frame Assembly.
16. Remove the XY (Frogleg) Assembly.
17. Remove the XYZ Control Box.
Remove the Z-Mechanism
The Z-Mechanism is fastened with several screws.
Follow this procedure to remove the Z-Mechanism:
1. Remove four (4x) screws from the lower part of the
Z-Mechanism.
2. Remove four (4x) screws.
3. Lift the Z-Mechanism away.
Install the Z-Mechanism:
Follow this procedure to install the Z-Mechanism:
1. Position the Z-Mechanism so the holes for the fixing screws
align.
2. Install two (2x) M6x16 Countersunk and two (2x) M6x16
screws.
3. Install four (4x) M6x16 (lower part of unit).
4. Install the XY (Frogleg) Mechanism.
5. Install the Lower Frame Assembly.
6. Install the Upper Frame Assembly.
7. Install the Bulkhead Plate.
8. Install the Bulkhead Board.
9. Install the Operating Panel, Lower.
10. Install the Operating Panel, Upper.
11. Install the LCD Arm assembly.
12. Install the LCD Monitor assembly.