Product Manual
Table Of Contents
- Vivid™ E80 / Vivid™ E90 / Vivid™ E95
- Table of Contents
- Chapter 1
- Introduction
- Chapter 2
- Site Preparations
- General Ultrasound system requirements
- Facility needs
- Environmental Dangers
- Chapter 3
- System Setup
- Setup reminders
- Receiving and unpacking the equipment
- Packing materials - recycling information
- Preparing for setup
- Completing the setup
- Configuration
- Connectivity overview
- Connectivity setup
- Product Locator Installation Card
- Chapter 4
- General Procedures and Functional Checks
- Chapter 5
- Components and Functions (Theory)
- Software overview
- InSite ExC
- Vivid E80/E90/E95 overview
- Top Console with LCD monitor and Operating Panel
- Main Console
- Air Flow control
- Casters and brakes
- Front End Processor (FEP)
- Back End Processor (BEP)
- Power distribution
- Input and Output (I/O) modules
- Restart Vivid E80/E90/E95 after diagnostics
- Chapter 6
- Service Adjustments
- Chapter 7
- Diagnostics/Troubleshooting
- Chapter 8
- Replacement Procedures
- Warnings and important information
- Loading the software
- Replacing covers and bumpers
- LCD Monitor and LCD Arm parts replacement
- Upper OP Panel/Touch Panel Assembly replacement
- Lower Operating Panel Parts replacement
- A/N Keyboard parts replacement
- Other Top Console Parts replacement
- Replacing XYZ Parts
- Main Console parts replacement
- Casters and Brakes replacement
- Front End Processor (FEP) / Card Cage parts replacement
- Back End Processor (BEP) parts replacement
- Main Power Supply replacement
- Patient I/O assembly replacement
- Peripherals replacement
- Cables replacement
- Chapter 9
- Renewal Parts
- List of Abbreviations
- Software for Vivid E80/E90/E95
- Covers and Bumpers
- Top Console parts
- XYZ parts
- Main Console parts
- Casters (wheels) parts
- Front End Processor (FEP) Card Rack parts
- Back End Processor (BEP) parts
- Main Power Supply
- I/O modules parts
- Peripherals for use with Vivid E80/ E90/E95
- Mains power cables - Vivid E80/E90/ E95
- Internal Cables - Vivid E80/E90/E95
- ECG cables - Vivid E80/E90/E95
- Physio TX parts
- Probes for Vivid E80/E90/E95
- Options - Vivid E80/E90/E95
- Chapter 10
- Care and Maintenance
- Index
Main Console parts replacement
Vivid E80/E90/E95 – Service Manual 8-71
GC091052 Rev. 3
1. Power down the Ultrasound system.
2. Disconnect the Mains Power Cable from the wall outlet.
3. Disconnect all probes and external I/O cabling.
4. Remove the Rotary buttons below the Touch screen and the
Volume button.
5. Remove the Operating Panel, Upper.
6. Remove the Operating Panel, Lower. Place it on a clean
surface with the front down.
7. Remove the Left Side Cover.
8. Remove the Top Cover.
9. Remove the Main Cable Cover.
Remove the Main Cable
Three cable connectors must be disconnected in the Operating
Panel area:
1. The cable with the D-SUB connector was disconnected from
the Controller Board when you removed the Operating
Panel, Upper.
2. Disconnect the HDMI cable from the Bulkhead.
3. Disconnect the cable from the Z switch (Up/Down control).
4. If not already done, unscrew the fixing screws on the
Ground (GND) Clamp on the Bulkhead Bracket, so you can
release the cables from the clamp.
Two cables are connected to the XY (Frog) brakes. They are
routed to connectors inside the rear XY (Frog) legs. To
disconnect these cables, follow this procedure:
1. Remove the covers on the rear XY (Frog) legs.
2. Disconnect the cables.
Two (2x) cables (from the Main Cable) are connected to the XYZ
Control box.
• Disconnect the two cables.
The remaining two cables originate on the I/O at the BEP.
• Disconnect the two cables.
The Cable Chain is attached with two screws in the UI end and
one screw in the other end.
1. Remove two screws from the Cable Chain’s anchor point at
the lower UI.
2. Remove one screw on the other end of the Cable Chain.