Product Manual
Table Of Contents
- Vivid™ E80 / Vivid™ E90 / Vivid™ E95
- Table of Contents
- Chapter 1
- Introduction
- Chapter 2
- Site Preparations
- General Ultrasound system requirements
- Facility needs
- Environmental Dangers
- Chapter 3
- System Setup
- Setup reminders
- Receiving and unpacking the equipment
- Packing materials - recycling information
- Preparing for setup
- Completing the setup
- Configuration
- Connectivity overview
- Connectivity setup
- Product Locator Installation Card
- Chapter 4
- General Procedures and Functional Checks
- Chapter 5
- Components and Functions (Theory)
- Software overview
- InSite ExC
- Vivid E80/E90/E95 overview
- Top Console with LCD monitor and Operating Panel
- Main Console
- Air Flow control
- Casters and brakes
- Front End Processor (FEP)
- Back End Processor (BEP)
- Power distribution
- Input and Output (I/O) modules
- Restart Vivid E80/E90/E95 after diagnostics
- Chapter 6
- Service Adjustments
- Chapter 7
- Diagnostics/Troubleshooting
- Chapter 8
- Replacement Procedures
- Warnings and important information
- Loading the software
- Replacing covers and bumpers
- LCD Monitor and LCD Arm parts replacement
- Upper OP Panel/Touch Panel Assembly replacement
- Lower Operating Panel Parts replacement
- A/N Keyboard parts replacement
- Other Top Console Parts replacement
- Replacing XYZ Parts
- Main Console parts replacement
- Casters and Brakes replacement
- Front End Processor (FEP) / Card Cage parts replacement
- Back End Processor (BEP) parts replacement
- Main Power Supply replacement
- Patient I/O assembly replacement
- Peripherals replacement
- Cables replacement
- Chapter 9
- Renewal Parts
- List of Abbreviations
- Software for Vivid E80/E90/E95
- Covers and Bumpers
- Top Console parts
- XYZ parts
- Main Console parts
- Casters (wheels) parts
- Front End Processor (FEP) Card Rack parts
- Back End Processor (BEP) parts
- Main Power Supply
- I/O modules parts
- Peripherals for use with Vivid E80/ E90/E95
- Mains power cables - Vivid E80/E90/ E95
- Internal Cables - Vivid E80/E90/E95
- ECG cables - Vivid E80/E90/E95
- Physio TX parts
- Probes for Vivid E80/E90/E95
- Options - Vivid E80/E90/E95
- Chapter 10
- Care and Maintenance
- Index
Casters and Brakes replacement
Vivid E80/E90/E95 – Service Manual 8-77
GC091052 Rev. 3
Remove the Front Casters
Follow this procedure to remove the Front Casters:
1. Turn front casters so they are pointing forwards.
2. Activate the direction lock.
3. Put the bevel edged board on the floor.
4. Pull the Ultrasound system backwards up the board incline.
This will lift the rear caster on the opposite side of the
Ultrasound system from the floor.
5. Turn the rear caster that stands on the bevel edged board in
the direction as shown in Figure 8-11 on page 8-74.
6. The Ultrasound system is now nearly balanced between
one front caster and one rear caster.
7. Make the Ultrasound system rest on both rear casters and
lift the front caster.
8. Put the wooden wedge under the chassis. This will stabilize
the Ultrasound system with one front caster free from the
floor.
9. Unscrew and remove the three fixing screws for the front
caster that is free from the floor. Save the screw for later
use.
10. Remove the front caster.
WARNING
Prior to elevating Ultrasound system:
• verify that the floating Operating Panel is locked in its
lowest, parking position.
• verify that the front brake is locked and the Ultrasound
system is unable to swivel.
• verify that the rear brakes are in the locked position.
WARNING
Use extreme caution as long as the Vivid E80/E90/E95 is
un-stable, not resting on all four casters.