Product Manual
Table Of Contents
- Vivid™ E80 / Vivid™ E90 / Vivid™ E95
- Table of Contents
- Chapter 1
- Introduction
- Chapter 2
- Site Preparations
- General Ultrasound system requirements
- Facility needs
- Environmental Dangers
- Chapter 3
- System Setup
- Setup reminders
- Receiving and unpacking the equipment
- Packing materials - recycling information
- Preparing for setup
- Completing the setup
- Configuration
- Connectivity overview
- Connectivity setup
- Product Locator Installation Card
- Chapter 4
- General Procedures and Functional Checks
- Chapter 5
- Components and Functions (Theory)
- Software overview
- InSite ExC
- Vivid E80/E90/E95 overview
- Top Console with LCD monitor and Operating Panel
- Main Console
- Air Flow control
- Casters and brakes
- Front End Processor (FEP)
- Back End Processor (BEP)
- Power distribution
- Input and Output (I/O) modules
- Restart Vivid E80/E90/E95 after diagnostics
- Chapter 6
- Service Adjustments
- Chapter 7
- Diagnostics/Troubleshooting
- Chapter 8
- Replacement Procedures
- Warnings and important information
- Loading the software
- Replacing covers and bumpers
- LCD Monitor and LCD Arm parts replacement
- Upper OP Panel/Touch Panel Assembly replacement
- Lower Operating Panel Parts replacement
- A/N Keyboard parts replacement
- Other Top Console Parts replacement
- Replacing XYZ Parts
- Main Console parts replacement
- Casters and Brakes replacement
- Front End Processor (FEP) / Card Cage parts replacement
- Back End Processor (BEP) parts replacement
- Main Power Supply replacement
- Patient I/O assembly replacement
- Peripherals replacement
- Cables replacement
- Chapter 9
- Renewal Parts
- List of Abbreviations
- Software for Vivid E80/E90/E95
- Covers and Bumpers
- Top Console parts
- XYZ parts
- Main Console parts
- Casters (wheels) parts
- Front End Processor (FEP) Card Rack parts
- Back End Processor (BEP) parts
- Main Power Supply
- I/O modules parts
- Peripherals for use with Vivid E80/ E90/E95
- Mains power cables - Vivid E80/E90/ E95
- Internal Cables - Vivid E80/E90/E95
- ECG cables - Vivid E80/E90/E95
- Physio TX parts
- Probes for Vivid E80/E90/E95
- Options - Vivid E80/E90/E95
- Chapter 10
- Care and Maintenance
- Index
Index-2 Vivid E80/E90/E95 – Service Manual
GC091052
Rev. 3
power stability requirements, 2-6
power transients
power transients, 2-6
site circuit breaker
site circuit breaker, 2-5
site power outlets
site power outlets, 2-5
specific requirements for the unit, 2-5
voltage drop-out
voltage drop-out, 2-6
electrical safety, 1-14
electrical specification, 3-19
electromagnetic compatibility (EMC), 1-19
electromagnetic interference
abatement, 2-8
prevention, 2-8
electrostatic discharge prevention, 1-20
EMC
compliance, 1-19
electromagnetic compatibility, 1-19
what is EMC?, 1-19
EMI
abatement, 2-8
prevention, 2-8
protection, 3-17
EMI limitations, 2-7
enter location, 3-26
environmental dangers, 2-18
environmental requirements, 2-2, 2-3
errors, i-16
ESD prevention, 1-20
ethernet
connect, 3-20
examine packages, 3-8
external I/O
connections, 3-20
external peripherals
for connection to USB, 3-36
for connection via Ethernet, 3-36
F
facility needs, 2-10
desirable features, 2-13
DICOM network function, 2-16
DICOM setup requirements, 2-16
InSite requirements, 2-15
minimal floor plan suggestion, 2-13
network setup requirements, 2-15
purchaser responsibilities, 2-10
recommended floor plan suggestion, 2-14
required facility needs, 2-12
suggested floor plan
scanner and EchoPAC in same room, 2-15
FEP
spare parts, 9-17
flash card
connect, 3-20
floor plan suggestion
mininal, 2-13
recommended, 2-14
scanner and EchoPAC in same room, 2-15
front end processor
spare parts, 9-17
functional checks, 4-9
G
general procedures, 4-2
general ultrasound system requirements, 2-2
electrical requirements, 2-4
H
heart microphone
connect, 3-21
hot or cold
if the ultrasound system is very cold or hot, 2-2
how often should maintenance tasks be performed?,
10-4
human safety, 1-8
I
I/O
parts, 9-20
icons, 1-4
icons indicating a special procedure to be used, 1-7
if the ultrasound system is very cold or hot, 2-2
important precautions, i-2
in/out modules
parts, 9-20
InSite
network requirements, 2-15
insite ExC, 5-3
installation
see "system setup", 3-1
installation warnings
see "setup warnings", 3-2
internal cables, 9-26
intra-operative probes, 9-33
introduction (chapter 1), 1-1
L
language
user interface
setup, 3-30
LCD arm parts, 9-9
legal notes, i-18
lighting, 2-3
linear array probes, 9-31
list of abbrevations, 9-2
loading software, 8-7
location
setup, 3-26
lockout/tagout (LOTO) requirements, 1-17