Product Manual

Table Of Contents
Vivid E80/E90/E95Service Manual Index-3
GC091052 Rev. 3
LOTO
lockout/tagout requirements, 1-17
M
main console parts, 9-15
main monitor parts, 9-9
main power supply, 9-19
mains power cables, 9-24
maintenance task schedule, 10-4
manufacturer, 1-23
mass
with monitor and peripherals, 3-18
mechanical safety, 1-11
model designations, 1-4
models covered by this manual, 1-2
N
network setup requirements, 2-15
O
omission and errors, i-16
OP parts, 9-11
operating panel parts, 9-11
operational and storage temperature for probes, 2-9
options, 9-34
overview of the ultrasound system, 1-3
P
packing materials
recycling information, 3-15
patient I/O
connections, 3-21
periodic maintenance inspection (PM), PM (periodic
maintenance inspection), 10-2
peripherals, 9-21
phased array sector probes, 9-31
phone numbers
customer assistance, 1-22
phono
connect, 3-21
physical dimensions, 3-18
physical inspection
at arrivel, 3-17
physio tx parts, 9-30
power cables
mains, 9-24
power supply
main, 9-19
precautions
certified electrical contractor statement, i-15
damage in transport, i-15
important precautions, i-2
service safety considerations, i-17
translation policy, i-2
prepeare for setup, 3-17
printer
add, 3-35
probe
connect, 3-22
disconnect, 3-24
probes, 9-31
convex, 9-32
curved array, 9-32
doppler, 9-32
intra-operative, 9-33
linear array, 9-31
phased array sector, 9-31
TEE (transesophageal phased array), 9-33
transesophageal phased array, 9-33
probes environmental requirements, 2-9
operational and storage temperature for probes,
2-9
product description, 1-3
product icons, 1-7
product locator installation card, 3-50
products covered by this manual, 1-2
purchaser responsibilities, 2-10
purpose of operator manual, 1-3
R
rear panel
connections, 3-20
receiving and unpacking, 3-4
receiving the product, 3-8
recycling information
packing materials, 3-15
required facility needs, 2-12
requirements
ultrasound system, 2-2
requirements verification, 3-18
returning/shipping probes and repair parts, 1-18
revision history, i-1
S
safety
human, 1-8
safety precaution messages, 1-4
select
unit of measure, 3-31
video format, 3-31
service safety considerations, i-17
service screen
setup, 3-32
setup
completion, 3-18
preparations, 3-17
reminders, 3-2
service screen, 3-32
setup warnings, 3-2
shipping/returning probes and repair parts, 1-18
shock indicator, 3-5