PREPARE THE OPENING
The Advantium 120V can be installed in
combination with other GE/Monogram appliances.
Always follow each product's Installation
Instructions to complete the installation.
Single Advantium 120V Installation:
Order a 30" wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
Construct
Bose
Min. 3/8"
_Plywood
Supported
by2x4or
2 x 2 Runners
oil Four Sides
Allow 2-1/8" case trim overlap on the sides,
1-1/16" overlap on the top and 7/8" overlap
on the bottom of the opening for all models.
Oven overlaps will conceal cut edges on all sides
of the opening.
When installed over a single oven or a warming
drawer, allow at least 2" between the two
openings. This separation will provide clearance
for bottom overlap of the Advantium 120V and the
other appliance overlaps.
Construct a solid oven floor of 3/8" min. thick plywood
supported by 2 x 4 or 2 x 2 runners on all sides.
The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
PREPARE THE OPENING {cont.)
Installation over a GE/Honogram
Warming Drawer:
23-1/2"
25_i/4"_"-
17-1/2"
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported
by2x4or2x
2 Runners oil
Four Sides
-2" Min.
(3" Recommended)
Worming
Drawer
Requirement
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer locution do not obstruct
the required interior depth and height. See Worming
Drawer installation instructions for details.