Installation guide

Installation Preparation
PreparationWITHOUTan AccessoryStorageDrawer
PREPARE THE OPENING (cont.)
Installationover a GE/Monogram oven:
2]-i/2"
17-i/2"
Construct Solid
Bottom Nin.
3/8" Plywood
_Supported by
2x4or2x2
Runners all
Four Sides
2" Min.
Recommended)
Per Oven
Requirement
,, If you are replacing u GE/Honogrum electric
double oven with the combined installation of
an Advantium 120V and a single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than the
2" minimum shown.
PREPARE THE OPENING (cont.)
Installation over a GE/Honogram Oven and
Warming Drawer:
23-1/2"
Per
Drawer
Requirement
Construct Solid
Bottom Hin.
3/8" Plywood
Supported by
_2x4or2x2
Runners all
Four Sides
....2" Min.
(3" Recommended)
Per Oven
Requirement
Min.
(3" Recommended)
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location
do not obstruct the required interior depth
and height. See Warming Drawer installation
instructions for details.
ACAUTION: Forpersonalsafety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added
weight of this approximate 80-pound oven, plus
additional oven loads of up to S0 pounds or a
total weight of 130 pounds.
APRECAUCION: Paraseguridad
personal, la superficie de montaje debe poder
soportar la carga del gabinete, adem6s del peso
aproximado de 80 libras del homo, m6s las
cargas adicionales del homo de hasta SOlibras
o un peso total de hasta 130 libras.