Full Product Manual

Installation instructions
for your new
Before you begin—Read these instructions completely and carefully.
IMPORTANTOBSERVE ALL GOVERNING CODES AND ORDINANCES.
Note to InstallerBe sure to leave these instructions with the
Consumer.
Note to Consumer— Keep these instructions with your Built-In
Air Conditioner Owner’s Manual and Installation
Instructions for future reference.
1
CRITICAL DIMENSIONS
NOTE: Care should be taken in location of electrical
supply entry in relationship to wall sleeve to ensure
access to power once the unit is installed.
RECOMMENDED
DIMENSIONS INSTALLATION CLEARANCE
A Topofcasetofinishedceiling—3 min.
B Projectionofcaseintoroom—1/4 min.
If more than 6 of the case projects
into the room, other support is
recommended.
C Projectionofcasetooutside—1/4 min.
D Height above finished floor or top of
carpet—0 min.
E Left/Rightsideofcasetoadjacent
wall—2 min.
31-61545GE09/28/09
INSTALL CASE LEVEL IN ALL DIRECTIONS
NOTE: Handle the case carefully. CASE LOCATION
As a general rule the air conditioner should
be located in an outside wall to ensure proper
distribution of conditioned air. It should be located
in a portion of the wall where there is no electrical
wiring or plumbing, and where there are no
obstructions immediately inside or outside.
Ceiling
“A”
“B”
“C”
Roomside
Outside wall
“D”
Finished floor or top of carpet
Outside wall
“E”“E”
Top of case
Printed in the United States
RAB46, RAB47
and RAB48 Room
Air Conditioner Case
for AJ Series Built-In
Models

Summary of content (12 pages)