Installation Instructions

INDOOR TYPE
General
To comply with the National Electrical Code and Underwriters Laboratories, the
load center must be installed in accordance with the information included on the
label on the inside of the equipment. This must also be done in accordance with
applicable local electrical codes, and by a qualified electrical contractor and/or
licensed electrician.
WARNING: Hazard of electrical shock or burn. Turn off power before working
inside this equipment.
1. Remove Front :
Slip front and accessory package back into carton to protect
finish.
- Back Out Mounting Screws ”M” & green ground-bonding screw “G” and save for
reuse.
- Slide Interior up to clear tabs and remove.
2. Remove Interior (optional)
M
M
G
Key-hole
Mounting holes
Remove oblong KO
and screw (both
sides)
TOP OR BOTTOM FEED
3. Mount Box
:
- For Flush Mount, line up front box edge with finished wall surface and mount on
sides through oblong KO as shown above using screws
- For Surface Mount, screw or nail through keyhole slot and mounting holes in back of
box as shown above
The load center will easily accommodate
incoming electrical service from the top
or bottom. Rotate the entire load center
enclosure if a bottom feed configuration is
required.
First knock center KO inward. Outer rings should be alternately pried up or
driven in one at a time.
4. Remove KO’S for all main and branch circuits.
5. Pull incoming service and branch circuit wiring into box
.
6. Replace interior
Reinstall mounting screws removed in Step 2.
7. Wire main, neutral, and equipment ground
.
Refer to rating label inside equipment for proper tightening torque. Equipment ground
is factory installed. Wire the ground and neutral as shown below.
For use as service equipment, terminate the grounding electrode to any neutral
terminal. Bond neutral to box as shown below.
Neutral
terminals
Equipment
Ground
terminals
AdditionalTGL2
Ground-kit
location
Bond neutral to box
using screw provided
Note: For additional equipment-ground, please order Equipment-Ground kit (TGL2)
PowerMark Gold ™Load Centers