Owners Manual

16 49-2000707 Rev. 4
Installation Preparation
NEW CONSTRUCTION, PRE-PLANNING, OR REMODELING
NOTE: For existing instruction, skip to the next section.
FOR TOP VENTING
ŶFor ducted installation through the top, the 8”
diameter hole (for 30” or 36” model) or the 10”
diameter hole (for 48” model) for the duct in the
ceiling must be center 6-1/4” away from the finished
rear wall in the installation space.
FOR BACK VENTING
Ŷ)RUGXFWHGLQVWDOODWLRQWKURXJKWKHEDFNWKH
10-1/2"H x 13-1/4”W cut out for the duct in the wall
must be centered in the installation space, left to
right and located 3-3/4” above intended install height
from bottom of the hood.
6-1/4”
3-3/4”
10-1/2"H x 13-1/4"W
Bottom of Hood
Ŷ7KHKRRGMXQFWLRQER[NQRFNRXWLVORFDWHG´WRWKH
left from center of the hood. Ensure enough wire length is
available to make electrical connection.
INSTALLATION INSTRUCTIONS