Installation guide

Installation Instructions
STEP 10 CONNECT WATER SUPPLY
(FREEZERMODELS ONLY)
!
.... L
J
jJJ
.J
/'
(
"\ House
'_...Water Supply
\,
Freezer /"
Water Supply /_
//
........ -JJ
Locate and bring the tubing to the front
of the cabinet.
Turn the water on to flush debris from the line.
Run about a quart of water through the tubing
into a bucket, then shut off the water.
Copper Tubing:
Slip a 1/4" nut and ferrule (provided) over both ends
of the copper tubing. Insert the tube into the union
fitting on the unit and tighten the nut to the union.
Turn on the water to check for leaks.
GE SmartConnect TM Tubing:
Insert the molded end of the tubing into
the refrigerator or freezer connection. Tighten
the compression nut until it isjust hand-tight.
Tighten one additional turn with a wrench.
Overtightening can cause leaks!
Turn on the water to check for leaks.
NOTE: Hake sure excess tubing length does not
interfere with the toekick installation.
ISTEP 111 START ICEMAKER
/
/
Power
Switch
FeelerArm
Icemaker
Slide the switch to ON. The icemaker will begin opera-
tion automatically.
Be sure nothing interferes with the sweep
of the feeler arm.
Discard the first full bucket of ice cubes.
Toturn the icemaker off, slide the switch to OFF.
ISTEP12 INSTALL TOEKICK
Locate the supplied toekick (shipped taped to the side
of the product). Install with 2 screws provided, adjust
to the desired height and tighten the screws.
A custom toekick can be installed to match
or complement the surrounding cabinetry.
Use the supplied toekick as a template to cut
out the notch.
SuppliedToel<icl<
1/4" orThickerToel<ick
IMPORTANT:The vented toekick must remain
unobstructed for proper air circulation and
operation.
2O