Installation guide
Installation Instructions
STEP 10 CONNECT WATER SUPPLY
(FREEZERMODELS ONLY)
!
.... L
J
jJJ
.J
/'
(
"\ House
'_...Water Supply
\,
Freezer /"
Water Supply /_
//
........ -JJ
• Locate and bring the tubing to the front
of the cabinet.
• Turn the water on to flush debris from the line.
Run about a quart of water through the tubing
into a bucket, then shut off the water.
Copper Tubing:
• Slip a 1/4" nut and ferrule (provided) over both ends
of the copper tubing. Insert the tube into the union
fitting on the unit and tighten the nut to the union.
• Turn on the water to check for leaks.
GE SmartConnect TM Tubing:
• Insert the molded end of the tubing into
the refrigerator or freezer connection. Tighten
the compression nut until it isjust hand-tight.
• Tighten one additional turn with a wrench.
Overtightening can cause leaks!
• Turn on the water to check for leaks.
NOTE: Hake sure excess tubing length does not
interfere with the toekick installation.
ISTEP 111 START ICEMAKER
/
/
Power
Switch
FeelerArm
Icemaker
• Slide the switch to ON. The icemaker will begin opera-
tion automatically.
• Be sure nothing interferes with the sweep
of the feeler arm.
• Discard the first full bucket of ice cubes.
• Toturn the icemaker off, slide the switch to OFF.
ISTEP12 INSTALL TOEKICK
• Locate the supplied toekick (shipped taped to the side
of the product). Install with 2 screws provided, adjust
to the desired height and tighten the screws.
• A custom toekick can be installed to match
or complement the surrounding cabinetry.
Use the supplied toekick as a template to cut
out the notch.
SuppliedToel<icl<
1/4" orThickerToel<ick
IMPORTANT:The vented toekick must remain
unobstructed for proper air circulation and
operation.
2O