Manual

CHECK INSTALLATION HARDWARE
Locate the hardware accessory box packed with
the hood and check contents.
3 charcoal filters
Air deflector with
upper duct connector
• Drill 1/8" Pilot Holes For Mounting Brackets.
Align edge 25-1/2" above Cooking Surface.
17-5/16"
3-15/16"
13-9/16"
2-5/32"
C
L
• Drill 1/8" Pilot Holes.
• Drill 1/8" Pilot Holes.
5-7/8"
Wall-mount template
10 wood
screws
10 metal wall
fasteners
2 Large
flat washers
2 Mounting brackets
3 Stainless
steel grease
filters
Decorative
duct covers
Duct cover bracket (not
required for recirculating
operation)
2 Phillips-
head duct
cover screws
2 Utensil rods with 4 machine screws
Additional Parts for Recirculation Operation
7
Installation Preparation
REMOVE THE PACKAGING
CAUTION: Wear gloves to protect
against sharp edges.
The vent hood is shipped secured to a shipping
board with 4 screws.
Remove the duct cover, parts box and foam
packaging.
Lift the hood out of the box.
Remove and properly discard the plastic wrapping.
Remove metal grease filters and side bar packaging.
To remove the shipping board, locate and remove
2 screws at the top of the assembly and 2 screws
inside the hood behind the filter guides on the left
and right sides. Discard the shipping board.
Remove junction box cover.
Remove knockout from junction box.
Install strain relief onto junction box.
Mounting screw
Shipping board
Shipping board
Mounting screw
Mounting
screw
Knockout
Junction box
NOTE: Additional tools, materials and hardware are
required to construct your wall framing support.