Installation Instr ct ® 36" Island Chimneg ZV925 i 49-80329-4 i Vent Hood
Installation Instructions AIAm^n_ll_lf" BEFORE YOU BEGIN Read these instructions carefullg. , IMPORTANT- Save these completelg and instructions for local inspector's use. "IM PORTANT- Observe all governing codes and ordinances. , Note to Installer - Be sure to leave these instructions with the Consumer. , Note to Consumer - Keep these instructions for future reference. , Skill Level - Installation of this vent hood requires basic mechanical and electrical skills. , Completion time - i to 3 hours.
Design Information CONTENTS Design Information Step 10, Install Upper Duct Cover ............................................... 16 Product Dimensions............................................................................... 3 Step 11, Install Lower Duct Cover ............................................... 17 Step 12, Install Duct Cover Trim ................................................... 17 Advance Planning Step 13, Install Metal Filter ............................................................
Advance Planning ADVANCE PLANNING POWER SUPPLY Ductwork Planning ,These vent hoods are equipped for 8" round ductwork. IMPORTANT -(Please , Determine the exact location of the vent hood. FOR PERSONAL SAFETY,THIS APPLIANCE lUST PROPERLYGROUNDED. , Plan the route for venting exhaust to the outdoors. , Use the shortest and straightest duct route possible. For satisfactorg performance, duct run should not exceed 100 ft. equivalent length for ang duct configurations.
Advance Planning Total DUCT FITTINGS Duct Piece Use this chart to compute maximum permissible lengths for duct runs to outdoors. Dimensions Equivalent Length* Round, straight 1 ft. foot (per length) 3-1/4" x 12" straight 1 ft. (per foot length) guantitg Used 90 ° elbow NOTE: Do not exceed maximum permissible !7ft. equivalent lengths! 45 ° elbow !0 ft. Maximum duct length: lO0 foot for range hoods. 90 ° elbow 3-1/4" x 12" 43 ft.
Installation Preparation Ceiling Height 7'-!!" 8' 8'-!" 8'-!" Possible Hood Installation Height (inches) 26 27 24 28 Mounting Frame Height (inches) 8'12" 25 34 1/2 B 8'-2" 29 30 1/2 A For optimum performance, the hood must be 24" min. and 30" max. above the cooking surface. 8'13" 26 34 1/2 B 8'-3" 30 30 1/2 A Use the chart on this page to accurately determine installation height and support frame adjustment, and to select the correct size top trim piece (A, B, C or D).
Installation Preparation TOOLS AND MATERIALS REQUIRED 3/8" swivel socket or pivoting hex socket wit.h 6" (NOTSUPPLIED) _ tnppe_ Ducttape s Keg hole saw Pencil and tape measure Electric or batterg-operated drill and 3/16" bits, Phillips and flat blade screwdriver bits. 8" round metal duct, length to suit installation. Safetg glasses / Spirit level Flashlight Wire nuts Saber saw or sawsall Step ladder Phillips and flat blade drivers © Strain relief for junction cover. !20V 60Hz.
Installation Preparation PARTS PROVIDED Locate the parts packed with the hood. Stainless steel filter Air deflector for recirculating installation HARDWARE 1 charcoal filter for recirculating installation PACKAGE Locate and check contents. Screws shown actual size.
Installation Preparation CONSTRUCT CEILING SUPPORT Plan the Location of the Hood and Ductwork , The hood should extend beyond the front and rear , Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the hood. edge of the cooking appliance. , The duct in the ceiling must be centered over the cooktop.
Installation Preparation CONSTRUCT CEILING SUPPORT CONTINUED EXAMPLE B 10-1/16" install 16" joist -spacing cross-framing symmetrically ÷over duct/cooktop centerline 2x4 cross 7- ...... 7-1/16"- \ Align duct to center Cooktop outline of cooktop Top view - ceiling joists run perpendicular to front of hood EXAMPLEC 10-1/16" install cross-framing symmetrically over duct/ cooktop centerline 2x4 cross framing 16"joist spacing Align duct to center of cooktop \ Cooktop outline Top view - ceiling jois
Installation Preparation CONSTRUCT CEILING SUPPORT CONTINUED , Secure each 2 x 4 block with at least four (4), #10 2 x 4 min. wood screws, Y' long (not supplied). Use 8 wood screws total for the two supports. , The cross framing must be accurately aligned to assure correct positioning of the hood. , The cross framing must be level in all directions. Check with a spirit level and adjust if necessarg. cross framing ',xx\ IMPORTANT: The ceiling structure must be capable of supporting the weight of the hood
Installation instructions INSTALLATION-VENTEDTO THE OUTSIDE ISTEP 11 MOUNT TEMPLATE , Align the template with the marks on the ceiling and tape in place. - Be sure the template is oriented correctlg with the front of the hood. , Use a plumb bob to be sure the mounting holes will provide parallel alignment with the countertop below. , Center punch all hole locations. , Drill pilot holes in the 4 screw locations. Use a 3/16" bit and drill approximatelg 1-1/2" deep.
Installation Instructions INSTALLATION-VENTEDTO THE OUTSIDE [STEP 3 CUT DUCT TO LENGTH FOR VENTED INSTALLATION ,, Measure from house duct to ISTEP 51 INSTALL HOOD ATTACHMENT SCREWS House duct exhaust opening. , Cut the 8" duct / z f length to size. , Slip duct over the exhaust opening. , Seal the connection J Duct length Install 4 screws # with duct tape. / J / 5 , Install 4 hood attachment screws in the bottom the support as shown. Leave 1/4" gap between screw head and support flange.
Installation instructions INSTALLATION-VENTEDTO THE OUTSIDE jSTEP 7i CONNECT CABLES [STEP 6 MOUNT THE HOOD ONTO THE SUPPORT ,AWARNING: Two people are required to lift and position the hood onto the support. ,&AVERTISSEMENT / : II faut deux Retainer personnes pour lever et mettre en place a hotte sur le support de montage. clip "-4 , Join the two cable connectors at the front of the hood. Secure the cables behind the retainer clip.
Installation Instructions INSTALLATION-VENTEDTO THE OUTSIDE STEP 8] CONNECT ELECTRICAL Verifg thot power is turned , Removejunction left side. off ot the source. AWARN ING: Ifhouse wiring isnot2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L approved anti-oxidant compound and aluminum-to-copper connectors. AAVERTISSEMENT box cover and knockout on the Knockout J-Box cover\\ : Si la maison n'est pas cablee avec deux ills et un f
Installation Instructions INSTALLATION-VENTEDTO THE OUTSIDE ISTEP 9] PREPARE THE DUCT COVERS ISTEP 10] INSTALL UPPER DUCT COVER , Remove the plastic protective covering on all , Place the tall duct covers onto the top of the duct pieces. , Install 3 cage nuts on each inside section of the top duct cover. The cage nuts fit into the rectangular slots, clips facing outward. , Install 3 cage nuts on each side of the lower duct covers. Rectangular slots hood. This section has venting holes on one end.
Installation Instructions INSTALLATION-VENTEDTO THE OUTSIDE ISTEP 111 INSTALL LOWER DUCT COVER STEP 12 INSTALL DUCT COVER TRIM Front bottom duct cover section (snap into place and secure with 6 screws - 3 per side) Plan diagram top view .................... _ront bottom duct , Install side brackets to secure the lower duct II I coversections tightlg against the upper duct. , Hold lower trim strips (narrow pieces) with hooks facing down. Place the hooks inside the slots and slide downward.
Installation instructions INSTALLATION-R ECIRCULATING ISTEP 11 MOUNT TEMPLATE , Align the template with the marks on the ceiling and tape in place. - Be sure the template is oriented correctlg with the front of the hood. , Use a plumb bob to be sure the mounting holes will provide parallel alignment with the countertop below. , Center punch all hole locations. , Drill pilot holes in the 4 screw locations. Use a 3/16" bit and drill approximatelg 14/2" deep.
Installation instructions INSTALLATI0 N-R ECIRCULATING STEP 3 INSTALL AIR DEFLECTOR, CUT DUCT FOR RECIRCULATING OPERATION ISTEP 41 INSTALL UPPER SUPPORT FRAME , Raise the upper support toward the ceiling. , Thread the house wiring through one of the large holes, preferablg on the left side. , Temporarilg, slide the air deflector into the support frame. , Carefullg engage the ceiling mounting screws to the keghole slots in the top of the frame. , Tighten the 4 mounting screws against the frame.
Installation instructions INSTALLATI0 N-R ECIRCULATING [STEP 5 INSTALL LOWER STRUCTURE TO UPPER STRUCTURE ISTEP 61 INSTALL BLOWER/MOTOR Raise the blower/ m . Slide lower frame into o motor piece toward the assembled frame. T- the upper frame. Hatch the marked alignment holes. . Carefullg raise the motor to the marked reference point while making sure the duct piece slips over the blower outlet flange. . Secure the upper and lower frame with 16 screws, 4 on each side of the frame. .
Installation instructions INSTALLATI0 N-R ECIRCULATING jSTEP 9 i CONNECT CABLES [STEP 7 INSTALL HOOD ATTACHMENT SCREWS / Retainer clip -..4 li / , Install 4 hood attachment screws in the bottom of the support as shown. Leave 1/4" gap between screw head and support flange. , Join the two cable connectors hood. Secure the cables behind the retainer clip. [STEP 8 MOUNT THE HOOD ONTO THE SUPPORT ,&WARNING: Two people are required to lift and position the hood onto the support.
Installation Instructions INSTALLATI0 N-R ECIRCULATING ISTEP 101 CONNECT ELECTRICAL Verify that power is turned , Removejunction left side. off at the source. AWARN ING: Ifhouse wiring isnot2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L approved anti-oxidant compound and aluminum-to-copper connectors. AAVERTISSEMENT box cover and knockout on the Knockout J-Box cover\\ : Si la maison n'est pas cablee avec deux ills et un fil
Installation Instructions INSTALLATI0 N-R ECIRCULATING ISTEP 111 PREPARE THE DUCT COVERS ISTEP 12] INSTALL UPPER DUCT COVER , Remove the plastic protective covering on all duct , Place the tall duct covers onto the top of the pieces. , Install 3 cage nuts on each inside section of the top duct cover. The cage nuts fit into the rectangular slots, clips facing outward. , Install 3 cage nuts on each side of the lower duct covers. Rectangular slots hood. This section has venting holes on one end.
Installation Instructions INSTALLATI0 N-R ECIRCULATING ISTEP 13] INSTALL LOWER DUCT COVER STEP 14 INSTALL DUCT COVER TRIM Front bottom duct cover section Isnap into place and secure with 6 screws - ] per side} Plan diagram top view __ ot om , Install side brackets to secure the lower duct II I cover sections tightlg against the upper duct. , Hold lower trim strips (narrow pieces} with hooks facing down. Place the hooks inside the slots and slide downward.
Installation instructions INSTALLATI0 N-R ECIRCULATING INSTALL FILTERS [STEP 16] FINALIZE INSTALLATION IMPORTANT: Check to be sure that the main ON/ OFF switch next to the motor is in the ON position. Charcoal , Remove all tape and packing material. , Refer to the Owner's Manual for operating instructions. filter , Install the black charcoal filter into the center opening. Secure the filter with thumbscrews on each side.
Notes 26
Notes 27
Note: While performing installations described in this book, safetg glasses or goggles should be worn. For Monogram® local service in your area, call 1.800.4¢¢.18¢5. Note: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. Monogram: [49-80329-4 02-13 I GE Printed in Mexico GE Appliances & Lighting Appliances General Electric Company Louisville, KY40225 monogram.