5| Commissioning
5.1  Preparations for start-up
5.4  Evacuation
 Firstevacuatethesystem andthenincludethe compressor in the evacuation process.
 Relievethecompressorpressure.
 Openthesuctionanddischargelinevalves.
 Evacuatethesuctionanddischargepressuresidesusingthevacuumpump.
 Attheendoftheevacuationprocess,thevacuumshouldbe<1.5mbarwhenthepumpisswitchedoff.
 Repeattheprocessasoftenasisrequired.
INFO!  To protect the compressor against inadmissible operating 
  conditions, high-pressure and low-pressure pressostats are 
  mandatory on the installation side.
Thecompressorhasundergonetrialsinthefactoryandallfunctionshavebeentested.Thereare
thereforenospecialrunning-ininstructions.
Check the compressor for transport damage!
5.2  Pressure strength test
DANGER!   Bursting! The compressor must only be pressurised using nitrogen 
(N
2
). Never pressurise with oxygen or other gases!
   The maximum permissible overpressure of the compressor must not 
beexceededatanytimeduringthetestingprocess(seenameplate
data)!  Do  not  mix  any  refrigerant  with  the  nitrogen  as  this  could 
cause the ignition limit to shift into the critical range.
Thecompressorhasbeenfactory-testedforpressureresistance.Thefollowingmustbeobservedif
theentireplantissubjectedtoanadditionalpressurestrengthtest:
 TesttherefrigerationcircuitaccordingtoEN378-2oracorrespondingsafetystandard.
5.3  Leak test
DANGER!   Bursting! 
 Do not mix any refrigerant with the nitrogen (N
2
) as this could cause 
the ignition limit to shift into the critical range.
 CarryouttheleaktestoftherefrigeratingsysteminaccordancewithEN378-2oracorresponding 
 safetystandardwithout including the compressor.