User Manual
 D
 GB
 F
 E
11
96031-02.2015-DGbF
4| Compressor assembly
•
 The compressor has a shut-off valve with multi-sided cutting ring for the safe installation of the  
 suction and discharge line.
Cutting ring function before tightening the union nut
. . . . . .
4.7  Pipe connections 
Fig. 17
Valve spindle seal
release
tighten
4.6  Operating the shut-off valves
  Before opening or closing the shut-off valve, release the valve spindle seal by approx. ¼ of a turn 
counter-clockwise.
  After activating the shut-off valve, re-tighten the adjustable valve spindle seal clockwise.
Fig. 15
Fig. 16
4.8  Laying suction and discharge line
INFO!   Proper layout of the suction and pressure lines directly after the    
    compressor is integral to the smooth running and vibration  
     behaviour of the system.
Procedure:
Push Union Nut (5) and Cut Ring (3) onto Pipe (2).
HandtightenUnionNut(5)untillocked.
InsertPipe(2)firmlyintorebatelocatedinSocket(6)ensuringthepipefitssnugly.Tighten
UnionNut(5)1½turnsusingaspanner/wrench,whilegrippingconnectingSocket(6)with
another spanner/wrench. This should cause the Cutting Edge (1) of Cut Ring (3) to Cut into 
Pipe (2) resulting in a visible collar. 










