6| Commissioning
  First evacuate the system and then include the compressor in the evacuation process.
  Relieve the compressor pressure.
  Open the suction and pressure line shut-off valves.
  Evacuate the suction and discharge pressure sides using the vacuum pump.
  At the end of the evacuation process, the vacuum should be < 1.5 mbar when the pump is switched off.
 Repeatthisprocessasoftenasisrequired.
 Make sure that the suction and pressure line shut-off valves are open.
  Fillingtheliquidrefrigerant:Itisrecommendedthatthesystemrstbelled
at standstill with gas on the high-pressure side up to a system pressure of at 
least5.2bar(ifitislledbelow5.2barwithliquid,thereisariskofdryice
formation).Furtherllingaccordingtosystem.
 To eliminate the possibility of dry ice formation when the system is operating 
(duringand after thellingprocess),the shut-off point of the low-pressure
switch should be set to a value of at least 5.2 bar. 
•Arefrigerantsupplement,whichmaybecomenecessaryafterstart-up,canbe
topped up in vapour form on the suction side.
 INFO!   Depending upon design of the CO
2
refrigerantllingbottle 
        (with/without tubing) CO
2
canbelledinliquidafterweightor 
     gaseously. 
        Use only high-dried CO
2
quality!
ATTENTION! 
 Avoid overfilling the machine with refrigerant!
 Donotchargeliquidrefrigerantintothesuction-sideonthe 
 compressor.
 Do not mix additives with the oil and refrigerant.
WARNING!   Never exceed the max. permissible pressures while charging.  
Precautionsmustbetakenintime(eg.operatingauxiliaryconden-
sing unit for standstill pressure control or high pressure stage of 
the cascade).
CAUTION! Wear personal protective clothing such as goggles and protective 
gloves!
6.5  Refrigerant charge