Install Manual
Table Of Contents
Fuel Conversion / Gas Connections
26 Installation Guidelines for 60 Hz Air-Cooled Generators
Natural Gas Installation (Typical)
Figure 5-6. Natural Gas Installation (typical)
NG BTU/h = ft
3
/h X 1000 Megajoules/h = m
3
/h X 37.26
A Fuel data decal
B Minimum distance from rear obstruction—see Distance Requirements
C Manual fuel shutoff valve (pressure port optional)
Must be located no more than 6 ft (1.83 m) away from fuel inlet
D Pipe fittings (field supplied)
E Flexible fuel line
F Check clearance with gas provider
G Size gas meter for 100% generator load plus all appliance loads
H For underground installations, verify piping system for code compliance
I Reinforcing rod with clamps
J To gas main
008965
A
D
E
C
G
H
J
B
F
I