Use And Care Manual
Owner’s Manual for 34 Ton Log Splitter 25
Operation
Hitch Coupler Adjustment
1. Close latch of coupler with ball in socket. Verify
locking trigger is properly engaged in its detent.
2. See Figure 3-18. Tighten lock nut (A) on underside
of coupler until spring (B) between nut and clamp
(C) is fully compressed. Loosen lock nut one-half
turn or just enough so latch is able to clamp and
unclamp from ball.
Figure 3-18. Clamp Assembly
005906
A
C
B