Installation Guide
Table Of Contents
- Installation Guidelines 60 Hz Air-Cooled Generators
- Table of Contents
- Section 1: Safety Rules & General Information
- Section 2: Unpacking and Inspection
- Section 3: Site Selection and Preparation
- Section 4: Generator Placement
- Section 5: Fuel Conversion / Gas Connections
- Section 6: Electrical Connections
- Section 7: Control Panel Startup / Testing
- Section 8: Troubleshooting
- Section 9: Quick Reference Guide
- Section 10: Accessories
- Section 11: Diagrams

Safety Rules & General Information
6 Installation Guidelines for 60 Hz Air-Cooled Generators
8. NFPA 70E: Standard For Electrical Safety In The
Workplace *
9. NFPA 110: Standard for Emergency and Standby
Power Systems *
10. NFPA 211: Standard for Chimneys, Fireplaces,
Vents, and Solid Fuel Burning Appliances *
11. NFPA 220: Standard on Types of Building
Construction *
12. NFPA 5000: Building Code *
13. International Building Code **
14. Agricultural Wiring Handbook ***
15. Article X, NATIONAL BUILDING CODE
16. ASAE EP-364.2 Installation and Maintenance of
Farm Standby Electric Power ****
17. ICC:IFGC
This list is not all-inclusive. Check with the Authority Hav-
ing Local Jurisdiction (AHJ) for any local codes or stan-
dards which may be applicable to your jurisdiction. The
above listed standards are available from the following
internet sources:
* www.nfpa.org
** www.iccsafe.org
*** www.rerc.org Rural Electricity Resource Council P.O.
Box 309 Wilmington, OH 45177-0309
**** www.asabe.org American Society of Agricultural &
Biological Engineers 2950 Niles Road, St. Joseph, MI
49085