Installation Manual

V5 Node B Installation Guide
Version 1.0.6 Page 16 of 44
Step 2 Parts Shipped & Tools Required
This section reviews the parts, ancillary materials and tools required to install the Node B.
Use this checklist (Table 6-1 & 6-2, below) to check quantity and quality of parts as they are
unpacked.
The Control Shelf crate contains the items listed in Table 5-1 and is illustrated in Figure 5-1.
The Radio Equipment shelf crate contains the items listed Table 6-2 and illustrated in
Figure 6-2.