User's Manual Part 1

Node B Rack Mount Installation Guide
Version 0.0.3 Page 17 of 39
In addition to standard construction equipment, the following tools and materials should be
available prior to installation:
Table 6-2 : Tools Required
Tools
Description
Basic telecommunications tool kit
Includes screwdriver, socket wrenches, etc.
Voltmeter
Fluke meter
Cable Stripper & Crimper
RJ 45 crimper connector
Ethernet cable test set Test for all Ethernet cables
Compass or Handheld GPS with signal indicator
Test for GPS signal at site location
Table 6-3 : Materials Required
Material
Description
CAT5 - 4 pair, double screened cable, recommended
Alcatel LANmark-5 F
2
TP or equivalent
IUB / LMT / T1 / E1 Cable
RJ45 Connectors
IUB / LMT / T1 / E1 Connections
CAT5 - 4 pair, double screened cable, recommended
Alcatel LANmark-5 F
2
TP or equivalent
Alarm distribution cable
10 mm
2
maximum Ground cable Grounding termination
M8 ring terminal
Grounding termination
BNC Right Angle Connectors Connectors for E3/T3 Connections
RG59 B/U-LSF and UV stabilised or equivalent Cable for E3/T3 Connections
Rack mounting 8 off Cage nuts + Screws – note these
are required to secure the shelves to the rack
typically M6 Thread screws, washers & rack
cage nuts
Rack/Cabinet or Enclosure
Installation and/or site specific
Shelf Supports or rails
Specific to rack/cabinet or enclosure
DIN 7/16 antenna connections
Connectors specific to antenna cable chosen
Antenna Cable
Site specific selection