Manual

Page 30 of 64 General Machine Products Co., Inc.
1. Ensure the power pack is running 2. Turn the hydraulic valve to the “on” position.
3. Press the power on/off button 4. Turn the air valve to the open position
(assuming the required amount of cable in in
the duct)
5. Turn the speed control valve towards
“MAX” until the required speed is achieved
TO RESTART