16. TROUBLESHOOTING GUIDE
Initial starting hydraulic pressure at the point of starting a cable installation the hydrau-
lic pressure must be between 290 - 580 psi (20-40 bar). If not, do not continue. See the
below sections “Will Not Achieve Max Pressure” and “Runs At Higher Than Ex-
pected Pressure” to rectify the problem before commencing cable installation.
WILL NOT ACHIEVE MAX PRESSURE
Hydraulic control valve not open fully
Speed control not positioned fully
Faulty power pack (check performance)
Jacking screw not tight enough (producing belt slip)
Worn pads due to cable slip
Excessive lubrication of chains (on to pads causing belt slip)
RUNS AT HIGHER THEN EXPECTED PRESSURE
Chains too tight / excessive clamping force.
Poor lubrication
Seized chain links
Over tightening of jacking screw
Misalignment of air chamber slider
Cable drum not rotating freely
Misalignment of entry guide
Poor duct, installation / friction
Insufficient out-put from compressor
Incorrect seal/collet fitted
Dirt / debris in pusher housings
CABLE BLOWING MACHINE STOPS SUDDENLY DURING CABLE INSTALLATION
Max pressure achieved
Obstacle in duct installation
Power Pack out of fuel
Emergency button pressed
Damaged lead between Power Pack and blowing machine
ENGINE DOES NOT STOP AT MAX PRESSURE
Emergency lead not connected
Electrical control panel not switched on
Battery low on power
Pressure switch unplugged
Fuse blown in control panel