User Manual

Side of Pole Mount
Panel Size "A"
up to 140 watts
or
Dimensions
26.5" X 59.5"
10.94 Sq.Ft. MAX
Panel Size "B"
145-205 watts
or
Dimensions
32.5" X 62.5"
14.10 Sq.Ft. MAX
Panel Size "C"
225 - 260 watts
or
Dimensions
39.5" X 65.5"
17.96 Sq.Ft. MAX
Panel Size "D"
265+ watts (72 cell)
or
Dimensions
39.2" X 77.1"
20.98 Sq.Ft. MAX
SOP-K
for 3" post SCH 40 or
80, can upgrade to a
4" post on request
1 module
1 module
NA
NA
SOP-X
for 3" post SCH 40 or
80, can upgrade to a
4" post on request
NA
NA
1 module
1 module
SOP-S
for 3" post SCH 40 or
80, can upgrade to a
4" post on request
2 modules
NA
NA
NA
SOP-Y
for 4" post SCH 40 or
80 or upgrade to larger
on request
NA
2 modules
2 modules
2 modules
Roof/Ground Mount
Panel Size "A"
up to 140 watts
or
Dimensions
26.5" X 59.5"
10.94 Sq.Ft. MAX
Panel Size "B"
145-205 watts
or
Dimensions
32.5" X 62.5"
14.10 Sq.Ft. MAX
Panel Size "C"
225 - 260 watts
or
Dimensions
39.5" X 65.5"
17.96 Sq.Ft. MAX
Panel Size "D"
265+ watts (72 cell)
or
Dimensions
39.2" X 77.1"
20.98 Sq.Ft. MAX
1 Module
1 Module
1 Module
1 Module
2 Modules
2 Modules
2 Modules
2 Modules
S-Rail Single
4 feet, 2 rails, 2 braces
1 Module
1 Module
1 Module
1 Module
2 Modules
2 Modules
2 Modules
2 Modules
4 Modules
4 Modules
3 Modules
3 Modules
New modules come on the market all the time with different wattage, mounting hole spacing and frame dimensions.
This chart gives an approximate guideline of how many modules fit on our mounts. If you find that you have a panel
that has wattage specified in one size category, and dimensions that fit in a different size category, go with the mount
that fits the dimensions of the panel.
To calculate square footage, multiply frame width by frame height (in inches) and divide that by 144. This will equal
your panel square footage. NOTE: millimeters divided by 25.4 = inches.
All mounting poles for post mounts are to be supplied by customer - note size required. Post mounts are built to go
on "A53 Schedule" pipe. This is the most common type of pipe and is readily available in most steel yards. The
Outside Diameter of the pipe is larger than the SCH size indicates. The OD is the critical measurement for our sockets
to fit correctly on the mounting post.
3" schedule pipe = 3 ½” OD 4" schedule pipe = 4 ½" OD 5"schedule pipe = 5 9/16" OD
6" schedule pipe = 6 5/8" OD 8" schedule pipe = 8 5/8" OD 10" schedule pipe = 10 ¾” OD