Installation Manual

Page 7 of 12
www.generalspecialtiesmfg.com
208-265-5244
Install the 2 ¼” x 2 ¼” end of telestrut
between the lugs on the bottom of the
pivot cap. Tighten the nyloc nut all the
way.
Bolt telestrut bracket to longitudinal with 3
½” sq. u-bolts. The dimension between the
“west” lug on the bracket and the inside of
the cross piece for your specific mount can
be found on the attached table.
Insert 7/16” bolt through lugs and upper
end of telestrut and tighten. Make sure
middle bolt is installed through telestrut in
the hole that is circled, tighten nyloc onto
bolt.