Instructions / Assembly

LIGHT AND LENS ASSEMBLY
9a. Install light bulbs into powerhead light socket(s).
9b. Insert lower lens tabs into slots in motor cover on powerhead.
9c. Snap upper lens tabs into place. It may be necessary to squeeze tabs down slightly to align tabs with
slots at top of opener frame.
CAUTION
DO NOT exceed maximum wattage, as the unit may overheat and permanent damage may occur. Each light bulb
should be no more than 60W MAX.
Do not use halogen, short neck, or specialty light bulbs as they may overheat the opener.
Compact CFL, LED, or Incandescent Bulbs can be used. 60W Max.
9c
9b
9c
9b
NOTE: Use of LED bulbs may reduce
the range of your remote controls.
For Grounded Outlet connection:
10a. Plug in the power cord to standard 115 VAC outlet. Coil excess cord and tape or twist tie it to top of
powerhead. (DO NOT PLACE ABOVE LIGHT BULBS.). Proceed to step 10d.
For Permanent Wiring by an Electrician:
10b. Cut existing power cord OUTSIDE CHASSIS.
10c. The wire connections must be made INSIDE CHASSIS and there must be at least 6" of new power supply
line wire INSIDE CHASSIS. (Conduit is optional. Conduit, strain relief, and wire nuts are not provided.)
WARNING
Opener is equipped with grounded electrical plug for your protection, and only ts grounded electrical
outlets. DO NOT alter plug in any way! If you have no grounded outlets, have one installed by a
licensed electrician. Opener must be properly grounded to prevent personal injury and equipment damage.
NEVER USE AN EXTENSION CORD! Check local building codes for any requirement that you must have a
permanent hard-wired connection.
Hot
Neutral
Ground
Ground
Wire nuts
12b
12b
Cut
1 Light Model 2 Light Model
CAUTION
DO NOT run opener until travel limits have been set to avoid damage to unit.
10d. Verify that the RED and GREEN lights are lit on the Safe-T-Beam®. If they are lit proceed to step 10e. If they
are not lit, return to step 7 and check wiring.
10e. Verify that the wall console is lit RED. If it is RED, proceed to step 11. If powerhead LED is blinking blue, press
the Sure-Lock® button on the console. If the console is not lit RED, return to step 8 and check wiring.
Refer to the Operation and Maintenance Manual for programming and
Battery Backup installation instructions.
INSTALLATION IS COMPLETE.
OPENER IS NOW READY TO PROGRAM!
CONNECTING POWER
12c
9a.
Install light bulbs into powerhead light socket(s).
For Grounded Outlet connection:
R
efer to the Operation and Maintenance Manual for programming and
Battery Backup installation instructions.
I
NSTALLATION
O
12b
12c
10b
10c
Installation & critical steps checklist prior to applying power:
F Check to ensure Turnbuckle lock-nuts have been tightened with
a wrench (Step 1k) This is a critical step to maintain tension on
the chain or belt.
F Check to ensure that wall control and photocells wires have been
routed through the channel to make sure they do not touch the
light bulbs (Steps 7 & 8).