Replacement Part List

1) Center idler pulley into EXTENDED header rail slot. Insert clevis pin through header rail hole
and idler pulley. Secure with cotter pin. Fig. 1.
2) Insert 5/16”-18 x 2” bolt into EXTENDED header rail and secure with nut.
3) Proceed with the assembly of the rail per Assembly Poster until step 1g.
4) Prior to step 1g, install chain extension.
5) Remove master link from threaded shaft assembly (Gold End) with needle nose pliers. Fig. 2.
6) Install chain extension with included master link. Fig 3.
7) Reinstall threaded shaft assembly to extended chain with master link removed in step 5. Fig. 3.
8) Continue with the installation poster at step 1g. Fig.4.
9) Discard original RED emergency release cord and install extended RED emergency release
cord included with this kit at step 6 on assembly poster.
Preparation: Refer to Assembly/Installation Poster, replace the header section of rail with the extension rail included with this kit.
Add Chain Extension prior to Step 1G. Add extended RED emergency release cord.
39028502639
RAIL EXTENSION KIT INSTRUCTIONS (Tube Type Chain Rail)
A Supplement To The Chain/Belt Drive Assembly & Instructions Poster
Installation Procedure
Fig. 1
Fig. 2
1g
GOLD THREADED
HEADER END ONLY
SILVER THREADED
MOTOR END ONLY
Fig. 3
Fig. 4
Chain Extension
&
Master Link
ELO-02/2015
Discard original rail section
Extended rail section step 1a & 1b from assembly poster
Continue at step 1g from assembly poster
Threaded Shaft Assembly (Gold End)

Summary of content (2 pages)