User Guide

8
©2019, 2020, 2021 Regal Rexnord Corporation, All Rights Reserved. MCIM21055E • Form# G0134E
SEQUENCE OF OPERATION
Assuming the default ON/OFF delays have not been changed and the user interface (UI) is receiving 24 VAC on the RED and BLUE
thermostat wires, the following will occur:
1. When the UI receives a thermostat input, the (UI Input Indicator) will change from ON to CONTINUOUS BLINKING.
2. The (Motor Indicator) will change from OFF to SOLID ON, and the motor will turn on. The motor will operate at the default airflow
setting or the last value selected in this demand.
3. When the thermostat demand ends, the (UI Input Indicator) will change from CONTINUOUS BLINKING to SOLID ON. If the UI
was receiving a (Y1 or Y2) demand, the motor will turn off and the (Motor Indicator) will change from SOLID ON to OFF. If the
UI was receiving a (W1 or W2) demand, the motor will continue to run for 90 seconds, then the motor will turn off and the (Motor
Indicator) will change from SOLID ON to OFF.
NOTE: If the thermostat is set to FAN ON and UI is receiving a thermostat input on (G), the (UI Input Indicator) will display as
CONTINUOUS BLINKING, the (Motor Indicator) will display as SOLID ON, and the motor will operate at the (G) airflow value.
The motor will follow the sequence above including delays; however, it will return to the (G) airflow value when all other demands
are de-energized.
The UI is set by default to automatically switch from W1 to W2 airflow 10 minutes after the thermostat demands for W1 is received.
This delay setting is to accommodate two stage fossil fuel systems with single stage thermostats.
If the UI is receiving a 1st stage (W1) thermostat demand, it will transition to the 2nd stage (W2) airflow value if one of the following occurs:
The UI receives the 2nd stage thermostat demand
The UI receives the 2nd stage input on the 16-pin plug
The UI (W1 to W2) time delay times out