User's Manual
Table Of Contents
- QF7D50300800 Manual
- Keyboard Capability 2
- ToughBook Information 3
- Standard Icons 4
- Display Channel (Frequency) Icons 4
- Powering and Booting Up 5
- Powering Down 7
- Playback Only Mode 8
- New Project Mode and Last Project Mode 20
- Collecting Data 32
- Limited Warranty, Limitations Of Liability And Restrictions
- Regulatory Information
- Section 1: Getting Started
- Keyboard Capability
- ToughBook Information
- Standard Icons
- Display Channel (Frequency) Icons
- Powering and Booting Up
- Powering Down
- Section 2: Playback Only, New Project, and Last Project Modes
- Playback Only Mode
- New Project Mode and Last Project Mode
- Collecting Data
- Appendix A: Cart and Antenna Assembly Instructions
- Appendix B: Battery Charger Information
- Appendix C: Dielectrics of Common Materials (Soil Conditions)
- Appendix D: Examples of Some Common Objects
- Appendix E: Glossary of Terms
- PageBreak
- Y15198D1 GPR Coordination Notice& Equip Reg
- Canadian Requirements for RSS
- Equipment CE Conformance
Quick Start Guide UtilityScan DF
Copyright © 2012 Geophysical Survey Systems, Inc. 39
All Rights Reserved
7 Connect the battery cable and insert the Antenna Battery to the battery mount on
the antenna.
8 Place the cover of the capsule, starting in the
back as shown. Make certain there is service loop
with the cables so that there is no tension with
the cables as the capsule moves up and down
during data collection. Latch the cover to the lock
position.