User's Manual
Table Of Contents
- QF7D50300800 Manual
- Keyboard Capability 2
- ToughBook Information 3
- Standard Icons 4
- Display Channel (Frequency) Icons 4
- Powering and Booting Up 5
- Powering Down 7
- Playback Only Mode 8
- New Project Mode and Last Project Mode 20
- Collecting Data 32
- Limited Warranty, Limitations Of Liability And Restrictions
- Regulatory Information
- Section 1: Getting Started
- Keyboard Capability
- ToughBook Information
- Standard Icons
- Display Channel (Frequency) Icons
- Powering and Booting Up
- Powering Down
- Section 2: Playback Only, New Project, and Last Project Modes
- Playback Only Mode
- New Project Mode and Last Project Mode
- Collecting Data
- Appendix A: Cart and Antenna Assembly Instructions
- Appendix B: Battery Charger Information
- Appendix C: Dielectrics of Common Materials (Soil Conditions)
- Appendix D: Examples of Some Common Objects
- Appendix E: Glossary of Terms
- PageBreak
- Y15198D1 GPR Coordination Notice& Equip Reg
- Canadian Requirements for RSS
- Equipment CE Conformance
Quick Start Guide UtilityScan DF
Copyright © 2012 Geophysical Survey Systems, Inc. 7
All Rights Reserved
Powering Down
It is essential that these steps are followed in order when powering down the system.
Failure to do so may result in boot-up issues*.
1 Tap on System Options.
2 Tap on System Shutdown.
3 Tap either:
• Exit: Close Application to return to start screen. At this point,
press and hold the power button for about 3 seconds.
The system will shut down properly.
• Power Off: Close Application and turn OFF System power.
The system will automatically shut down. (Recommended)
* If the system was not powered down properly and before the next time you
power up, you must remove and disconnect the battery on the antenna, the re-
connect it. This will turn the antenna off, then back on. You can now power
up normally.