Installation & Assembly

A
B
C
D
E
F
G
H
I
J
M6 x 100mm JCBC
M6 x 90mm JCBC
M6 x 60mm JCBC
M6 x 50mm JCBC
BARREL NUT
Ø8 x 35mm WOOD DOWEL
WOODEN PLUG
M4 X 25mm SCREW (F)
M4 X 25mm SCREW (Q/K)
ALLEN KEY M4
ADJUSTER
4pcs
4pcs
4pcs
2pcs
8pcs
8pcs
12pcs
33pcs
35pcs
1pcs
2pcs
WARNING!!
· Remove hardware from box and sort by size.
· Please check to see that hardware and parts are
present prior start of assembly.
· Please follow attached instruction in the same
sequence numbered to ensure fast and easy
assembly.
· Do not use this bed if any part is broken, torn
or missing.
· The assembly of this product requires two
people.
· Do not use any power tools as this may damage
the frame and will invalidate any claim.
PART LIST
HARDWARE LIST
1.
2.
3.
4.
Attach the headboard post (P1)
to the headboard (P2).
You will need to use
hardware :
P1
P2
P3
P4
P5
P6
P7
Headboard Post = 2pcs
Headboard = 1pcs
Side Rail = 2pcs
Footboard = 1pcs
Centre Rail = 1pcs
Support leg = 2pcs
Bed Slats (F) = 14pcs
Bed Slats (Q/K) = 15pcs
C = 4pcs
G = 4pcs
F = 4pcs
Attach the support legs (P6)
to the centre rail (P5)
using hardware :
D = 2pcs
Attach the centre rail (P5)
to the headboard (P2) and
footboard (P4) using
hardware :
H = 2pcs
G
G
D
J
G
I
A = 4pcs
E = 4pcs
F = 2pcs
G = 4pcs
I = 1pcs
Attach the side rail (P3)
to the headboard using hardware :
B = 4pcs
E = 4pcs
F = 2pcs
G = 4pcs
I = 1pcs
Attach the side rail (P3)
to the footboard (P4)
using hardware :
Fix the adjuster (J) to the
support leg (P6) using
hardware :
J = 2pcs
G
H
Lay the slats (P7) between the
side rail (P3) using hardware :
H = 3pcs
Attach the slats (P7) to the
centre rail (P5) using
hardware :
H = 28pcs (F)
or
H = 30pcs (Q/K)
F / Q / K

Summary of content (1 pages)