User Manual
Table Of Contents
- GV-Control Center User's Manual V3.1.0.0
- Copyright
- Content
- Chapter 1 Introduction
- Chapter 2 Getting Started
- Chapter 3 Live Video
- Chapter 4 Audio Communication
- Chapter 5 Playback
- Chapter 6 Remote DVR Applications
- Chapter 7 I/O Central Panel
- 7.1 Running the I/O Central Panel
- 7.2 The I/O Central Panel
- 7.3 Creating a Group for Cascade Triggers
- 7.4 Monitoring Hosts from the I/O CentralPanel
- 7.5 Configuring the I/O Central Panel
- 7.6 Viewing Connection Log
- 7.7 Setting Up Mode Schedule
- 7.8 Quick Link
- 7.9 Forcing Output
- 7.10 Editing Background Image
- 7.11 Managing a Group of I/O Devices
- 7.12 Controlling I/O Devices
- 7.13 Popping Up Live Video upon InputTrigger
- Chapter 8 Multi Monitors Applications
- 8.1 Application Position
- 8.2 Matrix View
- 8.3 Video Wall
- 8.3.1 Setting Up a Video Wall Server
- 8.3.2 The Layout List
- 8.3.3 Adding a Server and Configuring the Layout
- 8.3.4 Activating the Channel and Layout
- 8.3.5 Setting Up a Zoom Window
- 8.3.6 Setting Up a Scan Window
- 8.3.7 Displaying Remote Monitor, Web Page and PlayingBack Videos
- 8.3.8 Displaying Live View from Remote E-Map
- 8.3.9 Remotely Accessing the Video Wall Server
- 8.3.10 Updating the Video Wall Server Version
- 8.4 Fisheye View
- Chapter 9 Other Applications
- Chapter 10 System Configuration
- Appendix
Other Applications
135
9
9.4.2 Renaming Devices
You can modify the host name of multiple devices through a single interface, without visiting
each host’s settings page.
1. On the main screen, click the Batch Update Wizard button
and select Upgrade
Device Name. This window appears.
Figure 9-17
2. Select a device to be configured from the Host Name column. To select all the devices,
click
. To uncheck all the devices, click .
3. Type the new device name in the Rename column.
4. Click Start to start updating. When the update is completed, the new name is shown in
the New Setting column and the Status shows “Success”.
Success
Success
Success
SuccessExit 1Exit 1
Room 3 Room 3
Exit 2 Exit 2
Room 6 Room 6
Figure 9-18