Quick Installation Guide

Other Important Features
7
7.2 Setting Up Schedules
You can create a schedule to enable and disable recording, video analysis, I/O monitoring,
connection with Center V2 / VSM and PTZ object tracking at specific times each day.
1. Click Home
, select Toolbar , click Configure and then select Schedule
Edit. This dialog box appears.
Figure 7-3
2. Click Schedule and select Setup Wizard. The Setup Wizard dialog box appears.
3. Select the days you want to apply the schedule and click Next.
4. Name the schedule plan and click Next.
5. Select a button on the left (Camera, AVP, I/O Monitoring, Server or PTZ Object
Tracking) and drag across the timeline to enable it during that time.
Figure 7-4
39