Mach 1 Blow-off Valve Installation Instructions P.O. Box 1017 Riverwood NSW 2210 Ph: +612 9534 0099 Fax: +612 9534 3999 Website: www.gfb.com.au Email: sales@gfb.com.
Installation Instructions for GFB Mach 1 Blow-off Valve Included in kit (unless ordered with fittings other than standard): • • • Mach 1 BOV, fitted w/ 35mm base & 30mm recirc outlet 1 x screw-in trumpet 1 x o-ring • • 3 x M5 grub screws and nuts 1 x 30mm hose plug The Mach 1 comes complete with all the parts required to set it up as either a vent-to-atmosphere or a plumb back blow-off valve.
) Depending on the configuration you choose to set up your GFB valve (vent-to-atmosphere or plumb back), ensure the factory recirc hose that returns vented air to the intake is either plugged, or connected to your GFB valve’s outlet – do NOT leave it open to the atmosphere. Various sized plugs and plumb back outlets are also available if required. 4) Connect the vacuum nipple on the top of the GFB valve to the inlet manifold AFTER the throttle body (see schematic engine diagram).
Maintenance GFB products are designed and manufactured in a way that, in most circumstances, requires little or no regular maintenance. Cleaning and/or disassembly are only necessary if the piston does not move smoothly or if there is damage from dirt or other foreign objects.