Product manual

GFI EventsManager 14 Database Maintenance | 252
Screenshot 205: Database Operations Options dialog
3. Configure the options from the tabs described below:
Tab Description
General Specify the unique identifier by which this instance of GFI EventsManager will be identified on the network.
This identifier is used as part of the export file-name during Export to file operations.
Schedule Through the Schedule tab, specify:
Hours of the day during which maintenance jobs can be executed
The interval in hours/days with which maintenance jobs will be executed
The scheduled date/time when maintenance jobs will start being executed.
Table 81: Configuring database operations
4. Click Apply and OK.
Note
Schedule options can also be modified from Configuration tab > Options > Actions and
click Edit schedule options....
14.2 Creating maintenance jobs
With GFI EventsManager you can schedule maintenance jobs to be executed on a specific day, at a
specific time and at specific intervals. Database maintenance operations may require high utilization
of resources. This can degrade server and GFI EventsManager performance. Schedule maintenance
jobs to be executed after office hours to maximize the availability of your system resources and avoid
any possible disruptions to workflow.
GFI EventsManager supports two types of maintenance jobs as described below: