Instructions / Assembly

Tools: Ladder, Safety Glasses, Gloves, Measuring Tape, Pencil, Tin Snips & Metal Bending Tool
Before beginning the Clean Mesh™ installation, the gutters should be cleaned and tested to ensure they are free of
clogs, draining correctly, and in proper working order.
Step 1. Place the Clean Mesh™ panel onto the top of the
gutter, the panel should be approximately ¼" larger than
the gutter opening. Press the rear section downward to
meet the fascia or drip edge, this pressure fit will hold the
panel in place. Secure to the gutter lip using min. #6 x ½"
piercing point screws approx. 1" from each end and in the
middle of the panel. Butt additional panel ends tight
together before securing in place.
Step 2. At the gutter corner, begin the Clean Mesh™
panel angle cut at the front lip, then snip the weep hole
leg. Cut and remove the face of the next Clean Mesh™
panel to conform to the angle and butt tight together.
Step 3. At the termination end of the gutter system, you
will need to snip and remove the panel nose and the weep
hole leg approximately 2 inches from the gutter end. Bend
the 2" section downward at a 90° angle to create a cap at
the end of the system.
Step 4. Optional screws may be utilized at the sight line
channel into the fascia to provide additional structural
support for the entire gutter system.
• Always be aware of power line wires!
• Move your ladder into position for each panel installation.
• Always use a dissimilar metal barrier when installing panels in contact with different metals.
• Fascia mounts are ideal for metal and tile roofing, or screen room installations.
• Always maintain a positive panel slope, with no reverse slope.
CLEAN MESH™
#99442
INSTALLATION GUIDELINES

Summary of content (1 pages)