Instructions / Assembly

1. FRIEZE RUNNER - Top edge of runner channel must
be level and aligned with the bottom surface of the fascia
board. Using nailing flange of channel, nail and install along the entire length
of the wall surface. If installing soffit panels over existing wood soffits, soffit
‘J’ channel can be used in place of frieze runner and double channel.
1
2. SOFFIT PANELS - Slide into frieze runner channel. Secure to under edge of
fascia board using nails in panel grooves.
Continue panel installation for entire length of the wall.
2
3. DOUBLE-CHANNEL - To join panels at corners, cut double channel to fit
and match angle when positioned diagonally from frieze channel to corner of
fascia board.
CAUTION! - Sofit & Fascia products have sharp edges!
Handle with care. Always use protective eyewear, gloves
and appropriate clothing.
ALWAYS USE PROFESSIONAL FALL PROTECTION when working over 6 feet
above grade - See Appleton Building Products for a Rooftop Safety Kit
3 4
4. FASCIA - Begin at the corner, position to the underside of soffit panels,
pre-drill (align with soffit grooves) and nail through bottom lip of fascia trim
every 36 inches along bottom edge of fascia board
Never ‘face nail’ fascia. Do not drive nails tight – fascia must be ‘hung’ to allow expansion and help
prevent distortion. Allow at least 1 inch overlap of fascia where lengths meet.
BEND
CUT
1"
36 in.
TOOLS
TRIM NAILS
LEVEL
TAPE MEASURE
HAMMER SNIPS DRILL
SQUARE CHALK LINE
Use aluminum or stainless steel trim nails.
Ordinary galvanized steel nails will cause
premature corrosion.
Use Appleton color matched nails for a
professional job.
Refer to local building and safety codes before starting work. Obtain
professional advice for any applications not covered in these guidelines.
Frieze
Runner
1905 W. Haskel St., Appleton, WI 54914 • 800-558-3414 • www.appletonsupply.com
INSTALLATION GUIDELINES
SOFFIT & FASCIA
HIP ROOF
(4-way overhang)

Summary of content (2 pages)