Instructions / Assembly

TOTAL JACK™
ADJUSTABLE PITCH
PIPE FLASHING
INSTALLATION GUIDELINES
1. Set TOTAL JACK™ down, flat on the surface of the roof, next
to the pipe you are ventilating. Rotate the octagonal base flange
to achieve a vertical, upright position.
2. Place TOTAL JACK™ over the pipe (a). Adjust base, if
necessary.
3. Secure octagonal flange with fasteners and caulking as
approved by your local building code. Install remaining shingles in
accordance with manufacturer's specification
CAUTION! Working above grade is inherently
dangerous, be sure that proper fall protection
measures are in place. When working with
power tools, gloves and eye protection are
absolutely required.
For more information and installation video visit: www.totalroofjack.com
These installation guidelines are for use with typical or
standard applications. It is always recommended to seek
advice from a licensed professional, and to check with
your local building inspector or building permit office for
approvals and possible variations that may apply.