Instructions / Assembly

PLASTIC HARDWARE ASSEMBLY INSTRUCTIONS
Instructions
1. Place and hold gasket (B) over the shaped slots in top of mailbox as in diagram.
Insert top latch (A) through matching shaped slots in gasket and top of mailbox
and secure with wedge clip (C). See figure 2.
2. Insert door latch (D) through holes in front of door. Secure with latch clip (E).
3. Insert flag (G) in bracket (F) and align with holes in mailbox. With bracket locator pins
inside same patterned mailbox holes, press push pin (I) firmly into mailbox.
Secure with pin clip (H).
4. Mailbox is now ready for installation on post.
Fig. 1
Fig. 2
A
B
C
D
E
F
G
H
I
NOTE: CUSTOMERS ARE REQUIRED TO CONTACT THE LOCAL POST OFFICE BEFORE INSTALLING
THE MAILBOX TO ENSURE ITS CORRECT PLACEMENT AND HEIGHT AT THE STREET.
GENERALLY, MAILBOXES ARE INSTALLED AT A HEIGHT OF 41-45 IN. FROM THE ROAD SURFACE
TO INSIDE FLOOR OF THE MAILBOX OR POINT OF MAIL ENTRY (LOCKED DESIGNS) AND ARE
SET BACK 6-8 IN. FROM FRONT FACE OF CURB OR ROAD EDGE TO THE MAILBOX DOOR.
Taylorsville, MS 39168
CONTENTS
TOP LATCH
GASKET
A
B
WEDGE
CLIP
C
D
DOOR
LATCH
E
LATCH
CLIP
F
FLAG
BRACKET
G
RED FLAG
H
PIN CLIP
I
PUSH PIN
THIS PART
NOT USED

Summary of content (3 pages)