Installation Instructions
Table Of Contents
- Introduction
- Parts Lists
- Safety Information
- Installation
- Preparing for Installation
- 1 Before proceeding read and follow all safety instructions and procedures.
- 2 Open main access doors. Refer to MDE-2531, Pump and Dispenser Start-Up/Service Manual for acces...
- 3 Disconnect and remove existing hardware according to the following:
- 4 Remove door mounting pin and right options door.
- 5 If unit has Cash Acceptor, remove door alarm and all hardware from old door and save.
- 6 Dispose of door. Save pin for reassembly.
- Modifying Right Options Door On Wide Frame Units
- 1 Remove all hardware from new right options door according to the following steps and save all p...
- 2 Use center punch and hammer to mark placement of pump stop or call button hole on new right opt...
- 3 Away from fuel island, drill a 7/8 inch diameter hole in location illustrated above.
- 4 Remove any burrs around hole with deburring tool or rounded file.
- Re-installing Button
- 1 Hold contact base on back of door and align with hole drilled earlier.
- 2 Insert push button from front of door by aligning tabs with slots in base.
- 3 Turn push button 45˚ clockwise to lock button to base.
- 4 Tighten two screws on base to secure push button and base assembly to door.
- 5 Attach contact block to base with center screw if not already installed.
- 6 If unit does not have door alarm, reinstall all new right options door hardware except sheet me...
- Re-installing Door Alarm Switches
- 1 Remove lock hardware from new right options door.
- 1 Re-install C-clips removed from old right side option doors on new door.
- 2 Install door alarm assembly to door alarm assembly bracket with screw previously removed.
- 3 Attach door alarm assembly bracket to display board with screw previously removed.
- 4 Be sure magnet does not touch door alarm door bracket. Slightly move door alarm door bracket aw...
- 5 Reinstall all new right options door TRIND hardware except sheet metal cover by reversing proce...
- Installing Cables
- Position kit cables according to the following steps:
- 1 Carefully pry out printer cable retainer from underside of printer shelf.
- 2 Disconnect printer cable and pull cable out of 2 3/4" round hole from bottom, and install piece...
- 3 Feed three-prong end of power cable R20580-G2, J250 end of R20437-G01 ribbon cable and multiple...
- 4 Reinstall printer cable and retainer disconnected and removed in step 2.
- Position kit cables according to the following steps:
- Installing Card Cage
- Prepare T20538-G1 card cage for installation.
- 1 Locate tab at left front top of card cage.
- 2 From B side of unit, turning card cage sideways to unit, feed top and rear of card cage up and ...
- 3 Position card cage so that tab fits over latch cutout for main door latch to secure card cage t...
- 4 Position rear of card cage on edge of cabinet shelf for easy cable connection.
- 5 Connect three prong female end of power cable R20580-G2 to card cage at location shown.
- 6 Connect P7 on R20665-G1 to J7 and P8 on R20665-G2 to J8 on DCB at location shown.
- 7 Connect J186 on R20724-G1 cable to P186 on Gateway Board on top of card cage.
- Address Gateway Board Before Installing Card Cage
- MOC and Generic CRIND Addresses.
- Install card cage assembly.
- Prepare T20538-G1 card cage for installation.
- Installing Right Option Door
- Mount New Right Options Door
- Route cables to Right Option Doors
- 1 Route A side cable R20665-G1 through cable clamp inside door and secure along door with clamps ...
- 2 Route B side cable through clamps above CRIND tray to cable clamp inside door, and secure along...
- 3 Route cables around board as shown for both wide and narrow frame units, securing cable to boar...
- 4 Connect J182 on each cable to P182 on PCB assembly on option door.
- 5 Reinstall sheet metal cover on door, being careful to avoid crimping cables.
- Connecting Remaining Cables
- 1 From A side, pass J250 end of cable R20437-G01, J176 and JA ends of cable R20665-G1 and J177 an...
- 2 From B side, connect J176 on cable R20665-G1 to P176 on Power Supply PCB.
- 3 Connect J177 on cable R20665-G2 to P177.
- 4 Connect JA on R20665-G1 to PA on R20724-G1 cable.
- 5 Connect PA on R20665-G2 cable to JA on R20724-G1 cable.
- 6 Connect J250 on ribbon cable R20437-G01 to P250 on Gateway board on top of card cage.
- From A side of unit make the following connections:
- Connect R20580-G2 power cable according to the following:
- Preparing for Installation
- CRIND® BIOS TRIND™ Multi 1 Upgrade
- Dispenser Set-Up
- Addressing Dispenser
- Setting Baud Rate
- Testing TRIND™ Multi 1
- 1 If printer was removed, replace printer and reconnect two cables and ground.
- 2 Restore power to unit. Refer to Pump and Dispenser Service Manual MDE-2531.
- 3 Restoring power with new Bios will Cold Start the CRIND. Refer to CRIND Service Manual MDE-2562.
- 4 Present test tag at option door from a distance of 6'' or less. Light board should light and fl...
- 5 When using test tag, screen will show “Test Confirmed”. In regular operation, screen will displ...
- Completing Installation
- 1 Close and secure option and maindoor.
- 2 Install graphics. Refer to MDE-2620 Graphics Installation for The Advantage Series.
- 3 Peel backing paper off FCC label pate provided in kit.
- 4 Affix FCC label plate to inside frame sheathing on column under existing FCC label.
- 5 Restore power to unit. Refer to Pump and Dispenser Service Manual MDE-2531.
- Cable Block Diagrams
Installation
Page 16 MDE-3801 TRIND™ Multi 1 Transmitter/Receiver in Dispenser Retrofit Kit • 10/99
Install card cage assembly.
Install card cage by doing the following:
Note: While it is not necessary to remove printer to install card cage you may find your initial
installations easier if this is done. To do so, disconnect two cables and remove ground
connector to A side printer. Remove printer and printer mounting hardware from unit
and save for reinstallation.
1 Locate tab at left front top of card cage.
2 From B side, turn card cage sideways to unit, feed top and rear of card cage up and into shelf.
Note: Front of card cage will face B side.
3 Position card cage so that tab fits over latch cutout for main door latch, securing card cage to
shelf divider.
• If two screws on card cage pass through shelf secure from underside of shelf with two nuts
provided in kit.
• If screws were removed, secure card cage from underside of shelf by installing one screw
removed in section “Prepare T20538-G1 card cage for installation.” on page 14 up
through hole in shelf to clinch nut on card cage (see illustration above). Dispose of second
screw and two nuts.
Tab on
card cage
card cage front facing B side
clinch nut
Tab locks into shelf divided at latch cut-out