Installation Instructions
(800) 348-0746 www.gilpininc.com ©Gilpin Inc. 2011
sales@gilpininc.com
Install Your Summit™ and Fairfield™ Railing from Gilpin
Tools you will probably need:
Level Hacksaw Tape Measure Drill/driver w/bits String or chalk line
Determine location of newel posts.
o Locate edge of flanges at least 2-1/2” from edges of surface.
o Mounting holes in flanges must be drilled to accommodate method of securing to surface.
Mount flanges with long side laterally perpendicular to railing for maximum stability.
o Posts must be plumb.
o Shim if necessary with weather resistant shim materials.
If using Installation Spindles:
o Measure up from surface to installed height (“H)
on newel post. (36” or 42”). Mark
o Measure down 1-1/8”. M ark
o Center Installation Spindle on post.
o Fasten Installation Spindle with top at mark
with included screws.
Slide rail panel down over Installation Spindles beginning at bottom rail so top rail rests on
Installation Spindle.
Secure rail to Installation Spindle with supplied screws on both sides of top and bottom rails.
If using Swivel Fitting[s] (accommodates both vertical and horizontal angles)
Install according to instructions included with Swivel Fitting set.
OVER
Swivel Fitting
“H
Panel Width (“W)
Panel Width (“W)
Installed Height (“H)