Installation Guide
Part Description Quantity
A Hot handle 1
B Handle washer (Preassembled to Hot handle (A)) 2
C Hot valve (Preassembled to Hot handle (A)) 1
D Rubber washer (Preassembled to Hot valve (C)) 2
E Metal washer (Preassembled to Hot valve (C)) 2
F Douche spray head (Preassembled to Douche spray (G)) 1
G Douche spray 1
H Metal washer (Preassembled to Douche spray (G)) 2
I Rubber washer (Preassembled to Douche spray (G)) 1
J Nut (Preassembled to Douche spray (G)) 1
K Spray adapter (Preassembled to Douche spray (G)) 1
L Spray hose 1
M Transfer valve handle 1
N Transfer valve gasket (Preassembled to Transfer valve body (R)) 1
O Transfer valve washer (Preassembled to Transfer valve body (R)) 1
P Lock nut (Preassembled to Transfer valve body (R)) 1
Q Cold handle 1
R Transfer valve body (Preassembled to Transfer valve handle (M)) 1
S Cold valve (Preassembled to Cold handle (Q)) 1
T Lock nut (Preassembled to Hot handle (A)) 2
U Coupling nut (Preassembled to Hot handle (A)) 2
V Y-adapter (Preassembled to Transfer valve body (R)) 1
W Hose 2
AA Drain ange (Preassembled to Drain body (DD)) 1
BB Rubber washer (Preassembled to Drain body (DD)) 1
CC Lock nut (Preassembled to Drain body (DD)) 1
DD Drain body 1
EE Plunger (Preassembled to Drain body (DD)) 1
FF Lift rod 1
GG Thumb screw (Preassembled to Lift rod (FF)) 1
HH Lift rod strap 1
II Spring clip (Preassembled to Ball rod (JJ)) 1
JJ Ball rod 1
KK Ball nut (Preassembled to Ball rod (JJ)) 1
LL Bushing (Preassembled to Ball rod (JJ)) 1
MM Base 1
NN Base washer 1
OO Rubber washer 1
PP Metal washer 1
QQ Nut 1
RR Rod sleeve 1
4